BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//EU Deadline Radar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:EU Deadline Radar (Poland\, small)
NAME:EU Deadline Radar (Poland\, small)
X-WR-CALDESC:Compliance deadlines for your profile. https://eudeadlines.eu/
 ?c=PL&s=small
BEGIN:VEVENT
UID:pl-intrastat-monthly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260910
DTEND;VALUE=DATE:20260911
SUMMARY:Poland INTRASTAT declarations: Poland: INTRASTAT declaration due by
  the 10th (once statistical thresholds are exceeded)
RRULE:FREQ=MONTHLY;BYMONTHDAY=10
DESCRIPTION:Businesses whose intra-EU trade in goods (arrivals or dispatche
 s) exceeds the basic statistical reporting threshold set annually by GUS m
 ust file a monthly INTRASTAT declaration covering the value and nature of 
 goods moved to or from other EU member states\, by the 10th of the followi
 ng month.\n\nWho is affected: Poland-registered importers/exporters tradin
 g goods with other EU countries above the annual GUS threshold - most rele
 vant to an e-commerce importer sourcing or shipping stock across the EU at
  meaningful volume\; a small SaaS business with no physical goods trade is
  not affected.\n\nWhat to do: Monitor cumulative intra-EU arrivals and dis
 patches values against the current-year GUS thresholds\; once exceeded\, r
 egister for INTRASTAT and file the monthly declaration via the PUESC platf
 orm by the 10th of the month following the reporting month.\n\nPenalty: Mo
 netary penalty of up to PLN 3\,000 imposed by the customs authority for la
 te or missing INTRASTAT declarations.\n\nNote: Re-checked 2026-09-09: stat
 .gov.pl/intrastat/ redirects to the new.stat.gov.pl homepage\; no dedicate
 d Intrastat page was found this session. Current-year PLN thresholds and t
 he 10th-of-month deadline could not be independently re-verified. Verify w
 ith GUS/KAS before relying on the exact PLN figures.\n\nStatus: Confirmed\
 nhttps://eudeadlines.eu/deadline/pl-intrastat-monthly
URL:https://eudeadlines.eu/deadline/pl-intrastat-monthly
CATEGORIES:PL,Poland INTRASTAT declarations
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland INTRASTAT declarations: Poland: INTRASTAT declaration du
 e by the 10th (once statistical thresholds are exceeded) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland INTRASTAT declarations: Poland: INTRASTAT declaration du
 e by the 10th (once statistical thresholds are exceeded) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:cra-vulnerability-incident-reporting@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260911
DTEND;VALUE=DATE:20260912
SUMMARY:Cyber Resilience Act: CRA: mandatory reporting of actively exploite
 d vulnerabilities and severe incidents to ENISA/CSIRT
DESCRIPTION:Manufacturers of products with digital elements (hardware and s
 oftware\, including SaaS-connected devices and standalone apps) must repor
 t actively exploited vulnerabilities and severe security incidents through
  ENISA's single reporting platform: early warning within 24 hours\, full n
 otification within 72 hours\, final report within 14 days (vulnerabilities
 ) or one month (incidents). It applies to products already on the market.\
 n\nWho is affected: Manufacturers that place a 'product with digital eleme
 nts' on the EU market as a distinct product — connected/embedded hardwar
 e\, distributable/installable software\, firmware\, and apps a manufacture
 r ships with a device — including small vendors and commercially-run ope
 n source. A pure browser-delivered SaaS with no distributed installable pr
 oduct is generally OUT of CRA scope per Recitals 11-12 (standalone remote 
 data-processing solutions are excluded)\; the flags below can only approxi
 mate this distinction\, so read this note rather than relying on the tags 
 alone if you sell software purely as a hosted service.\n\nWhat to do: Set 
 up an internal process to detect and triage exploited vulnerabilities and 
 incidents in your products. Register on the ENISA single reporting platfor
 m and identify your national CSIRT. Draft report templates and an on-call 
 rota so you can meet the 24h/72h clocks. Inform affected users of fixes.\n
 \nPenalty: Up to €15M or 2.5% of worldwide turnover\n\n\nStatus: Confirm
 ed\nhttps://eudeadlines.eu/deadline/cra-vulnerability-incident-reporting
URL:https://eudeadlines.eu/deadline/cra-vulnerability-incident-reporting
CATEGORIES:EU,Cyber Resilience Act
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Cyber Resilience Act: CRA: mandatory reporting of actively expl
 oited vulnerabilities and severe incidents to ENISA/CSIRT — due in 7 day
 s
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Cyber Resilience Act: CRA: mandatory reporting of actively expl
 oited vulnerabilities and severe incidents to ENISA/CSIRT — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-ppk-contributions-monthly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260915
DTEND;VALUE=DATE:20260916
SUMMARY:Poland Employee Capital Plans (PPK): Poland: employer PPK (Pracowni
 cze Plany Kapitałowe) contribution transfer due by the 15th
RRULE:FREQ=MONTHLY;BYMONTHDAY=15
DESCRIPTION:Employers must calculate and transfer employee and employer PPK
  (Employee Capital Plan) contributions\, deducted from salaries paid durin
 g the month\, to the selected PPK financial institution by no later than t
 he 15th of the following month.\n\nWho is affected: Poland-registered empl
 oyers with at least one employee enrolled in PPK (auto-enrolment for emplo
 yees aged 18-54 who have not opted out). Micro-employers with fewer than 1
 0 people employed are exempt only if every employee has submitted a resign
 ation declaration\; the self-employed with no staff have no PPK obligation
 .\n\nWhat to do: Calculate employee and employer PPK contributions from ea
 ch payroll run\, and transfer both amounts to the employees' PPK accounts 
 at the chosen financial institution by the 15th of the month following the
  month the contributions were calculated and deducted.\n\nPenalty: Fine of
  PLN 1\,000 to PLN 1\,000\,000 under the PPK Act for failing to calculate\
 , collect or transfer PPK contributions\, or for encouraging employees to 
 resign from PPK.\n\nNote: Re-checked 2026-09-09: mojeppk.pl is reachable b
 ut its homepage shows only a general disclaimer\, with no specific deadlin
 e text extracted this session. The 15th-of-month deadline and Art. 28(4) l
 egal basis remain well-established and unchanged.\n\nStatus: Confirmed\nht
 tps://eudeadlines.eu/deadline/pl-ppk-contributions-monthly
URL:https://eudeadlines.eu/deadline/pl-ppk-contributions-monthly
CATEGORIES:PL,Poland Employee Capital Plans (PPK)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland Employee Capital Plans (PPK): Poland: employer PPK (Prac
 ownicze Plany Kapitałowe) contribution transfer due by the 15th — due i
 n 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland Employee Capital Plans (PPK): Poland: employer PPK (Prac
 ownicze Plany Kapitałowe) contribution transfer due by the 15th — due i
 n 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-zus-contributions-dra-monthly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260915
DTEND;VALUE=DATE:20260916
SUMMARY:Poland ZUS social insurance contributions: Poland: ZUS social insur
 ance contributions and DRA declaration due by the 15th (legal persons)
RRULE:FREQ=MONTHLY;BYMONTHDAY=15
DESCRIPTION:Employers must submit the ZUS settlement declaration (ZUS DRA) 
 together with personal monthly reports (ZUS RCA/RSA/RPA)\, and pay social 
 and health insurance contributions for the reporting month\, by a deadline
  that depends on the payer's legal form: the 15th of the following month f
 or payers with legal personality (e.g. sp. z o.o.)\, the 20th for other pa
 yers (sole traders\, personal partnerships)\, and the 5th for budget units
 .\n\nWho is affected: Every Poland-registered ZUS contribution payer\, inc
 luding a self-employed sole trader (JDG) paying only their own contributio
 ns\; a sp. z o.o. (a capital company with legal personality) falls under t
 he 15th-of-month deadline described here\, while sole traders and personal
  partnerships use the 20th (see the action text below).\n\nWhat to do: Sub
 mit the ZUS DRA declaration and personal monthly reports and pay social in
 surance and health-insurance contributions for the reporting month by the 
 15th of the following month if organized as a legal person (sp. z o.o.\, s
 półka akcyjna\, spółdzielnia). Sole traders and personal partnerships 
 (spółki jawne\, partnerskie\, komandytowe\, komandytowo-akcyjne) instead
  follow the 20th-of-month deadline.\n\nPenalty: Late-payment interest (ods
 etki za zwłokę) on unpaid contributions\; administrative and\, in cases 
 of persistent non-payment\, criminal liability under the Social Insurance 
 System Act (Ustawa o systemie ubezpieczeń społecznych).\n\n\nStatus: Con
 firmed\nhttps://eudeadlines.eu/deadline/pl-zus-contributions-dra-monthly
URL:https://eudeadlines.eu/deadline/pl-zus-contributions-dra-monthly
CATEGORIES:PL,Poland ZUS social insurance contributions
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland ZUS social insurance contributions: Poland: ZUS social i
 nsurance contributions and DRA declaration due by the 15th (legal persons)
  — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland ZUS social insurance contributions: Poland: ZUS social i
 nsurance contributions and DRA declaration due by the 15th (legal persons)
  — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-cit-advances-monthly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260920
DTEND;VALUE=DATE:20260921
SUMMARY:Poland CIT advance payments: Poland: monthly CIT advance payment du
 e by the 20th (quarterly option for small taxpayers)
RRULE:FREQ=MONTHLY;BYMONTHDAY=20
DESCRIPTION:CIT taxpayers must calculate and pay a monthly advance on corpo
 rate income tax by the 20th of the following month. Small taxpayers (mali 
 podatnicy\, turnover up to EUR 2 million) may instead elect quarterly adva
 nces\, due by the 20th of the month after each quarter\, provided they not
 ify the choice via their annual CIT return.\n\nWho is affected: All Poland
 -registered CIT taxpayers (sp. z o.o.\, S.A. and other CIT payers) generat
 ing taxable income during the year.\n\nWhat to do: Calculate the monthly C
 IT advance as the difference between cumulative tax due since the start of
  the tax year and advances already paid\, and pay it by the 20th of the fo
 llowing month (no monthly declaration is filed - the advance is only recon
 ciled in the annual CIT-8 return). Small taxpayers may elect quarterly adv
 ances instead\; the advance for the final month/quarter can be skipped if 
 the annual return and balance are filed before that deadline.\n\nPenalty: 
 Late-payment interest under Article 53 of the Tax Ordinance on CIT advance
 s paid after the deadline.\n\n\nStatus: Confirmed\nhttps://eudeadlines.eu/
 deadline/pl-cit-advances-monthly
URL:https://eudeadlines.eu/deadline/pl-cit-advances-monthly
CATEGORIES:PL,Poland CIT advance payments
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland CIT advance payments: Poland: monthly CIT advance paymen
 t due by the 20th (quarterly option for small taxpayers) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland CIT advance payments: Poland: monthly CIT advance paymen
 t due by the 20th (quarterly option for small taxpayers) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-pfron-declaration-monthly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260920
DTEND;VALUE=DATE:20260921
SUMMARY:Poland PFRON monthly declaration: Poland: monthly PFRON declaration
  and payment due by the 20th (employers with 25+ employees)
RRULE:FREQ=MONTHLY;BYMONTHDAY=20
DESCRIPTION:Employers with at least 25 full-time-equivalent employees whose
  disability-employment rate is below the statutory 6% must calculate\, dec
 lare (DEK-I-0 or the applicable DEK-I-a/b form)\, and pay their monthly co
 ntribution to the State Fund for Rehabilitation of Disabled Persons (PFRON
 ) by the 20th of the month following the month the obligation arose.\n\nWh
 o is affected: Poland-registered employers reaching the 25-FTE-employee th
 reshold whose disability-employment rate is below the statutory 6% (employ
 ers meeting the 6% rate\, and most public/some other exempt employers\, ow
 e no contribution).\n\nWhat to do: Calculate the monthly average employmen
 t and disability-employment indicator\, determine the PFRON contribution d
 ue\, and submit the DEK-I-0 (or applicable DEK-I-a/b) declaration with pay
 ment via the e-PFRON2 system by the 20th of the following month.\n\nPenalt
 y: Late-payment interest on overdue PFRON contributions\; PFRON can pursue
  enforcement action for non-payment or non-declaration.\n\n\nStatus: Confi
 rmed\nhttps://eudeadlines.eu/deadline/pl-pfron-declaration-monthly
URL:https://eudeadlines.eu/deadline/pl-pfron-declaration-monthly
CATEGORIES:PL,Poland PFRON monthly declaration
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PFRON monthly declaration: Poland: monthly PFRON declara
 tion and payment due by the 20th (employers with 25+ employees) — due in
  7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PFRON monthly declaration: Poland: monthly PFRON declara
 tion and payment due by the 20th (employers with 25+ employees) — due in
  1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-pit-advances-employer-monthly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260920
DTEND;VALUE=DATE:20260921
SUMMARY:Poland PIT advances on employee salaries (płatnik): Poland: employ
 er's monthly PIT advance payment on employee salaries due by the 20th
RRULE:FREQ=MONTHLY;BYMONTHDAY=20
DESCRIPTION:Employers acting as PIT withholding agents (płatnik) must calc
 ulate\, withhold and pay personal income tax advances on salaries and othe
 r reportable employment income by the 20th of the month following payment.
  There is no monthly PIT-4R filing - the withheld amounts are only reporte
 d once a year in the annual PIT-4R declaration.\n\nWho is affected: Every 
 Poland-registered employer paying salaries\, board-member remuneration\, o
 r other employment income subject to PIT withholding.\n\nWhat to do: Calcu
 late and withhold PIT advances on wages paid during the month\, then pay t
 he withheld amount to the tax office's microrachunek podatkowy by the 20th
  of the following month. File the annual PIT-4R return (plus individual PI
 T-11 statements) after year-end\; no monthly PIT-4R submission is required
 .\n\nPenalty: Late-payment interest under Article 53 of the Tax Ordinance\
 ; a płatnik who fails to withhold or remit PIT advances risks personal pa
 yer liability under the Tax Ordinance.\n\n\nStatus: Confirmed\nhttps://eud
 eadlines.eu/deadline/pl-pit-advances-employer-monthly
URL:https://eudeadlines.eu/deadline/pl-pit-advances-employer-monthly
CATEGORIES:PL,Poland PIT advances on employee salaries (płatnik)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PIT advances on employee salaries (płatnik): Poland: em
 ployer's monthly PIT advance payment on employee salaries due by the 20th 
 — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PIT advances on employee salaries (płatnik): Poland: em
 ployer's monthly PIT advance payment on employee salaries due by the 20th 
 — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-jpk-v7m-monthly-vat@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260925
DTEND;VALUE=DATE:20260926
SUMMARY:Poland JPK_V7 (VAT records and declaration): Poland: JPK_V7M monthl
 y VAT return and payment due by the 25th
RRULE:FREQ=MONTHLY;BYMONTHDAY=25
DESCRIPTION:VAT-registered businesses in Poland must submit the JPK_V7M str
 uctured VAT records-and-declaration file and pay any VAT due by the 25th o
 f the month following the settlement period. Small taxpayers may instead s
 ettle quarterly as JPK_V7K\, though the records portion is still sent ever
 y month.\n\nWho is affected: VAT-registered companies in Poland on the sta
 ndard monthly settlement\; small taxpayers (mali podatnicy\, turnover up t
 o EUR 2 million including VAT) may opt into quarterly JPK_V7K filing inste
 ad.\n\nWhat to do: File JPK_V7M via the e-Deklaracje/JPK system and pay an
 y VAT due into the microrachunek podatkowy by the 25th of the following mo
 nth. If eligible and opted into quarterly settlement\, submit JPK_V7K: rec
 ords only for months 1-2 of the quarter (still by the 25th of each of thos
 e months)\, and records plus the declaration for month 3\, by the 25th aft
 er quarter-end.\n\nPenalty: Late-payment interest under Article 53 of the 
 Tax Ordinance (Ordynacja podatkowa) on VAT paid after the deadline\, plus 
 possible fines under the Fiscal Penal Code for late or missing JPK_V7 fili
 ngs.\n\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/pl-jpk-v7m-mo
 nthly-vat
URL:https://eudeadlines.eu/deadline/pl-jpk-v7m-monthly-vat
CATEGORIES:PL,Poland JPK_V7 (VAT records and declaration)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland JPK_V7 (VAT records and declaration): Poland: JPK_V7M mo
 nthly VAT return and payment due by the 25th — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland JPK_V7 (VAT records and declaration): Poland: JPK_V7M mo
 nthly VAT return and payment due by the 25th — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-vat-ue-summary-monthly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260925
DTEND;VALUE=DATE:20260926
SUMMARY:Poland VAT-UE summary information: Poland: VAT-UE summary informati
 on (informacja podsumowująca) due by the 25th
RRULE:FREQ=MONTHLY;BYMONTHDAY=25
DESCRIPTION:VAT-registered businesses that made intra-EU supplies of goods\
 , intra-EU acquisitions of goods\, or reverse-charge B2B services in a giv
 en month must file a VAT-UE summary information return listing the counter
 parties and values\, by the 25th of the following month. No filing is requ
 ired for a month with no such intra-EU transactions.\n\nWho is affected: P
 oland-registered VAT payers trading goods or reverse-charge services with 
 VAT-registered counterparties in other EU member states\, e.g. a SaaS comp
 any invoicing EU business customers or an importer/exporter moving goods w
 ithin the EU.\n\nWhat to do: Track intra-EU supplies\, acquisitions and re
 verse-charge services each month\; if any occurred\, file the VAT-UE (info
 rmacja podsumowująca) electronically via e-Deklaracje by the 25th of the 
 following month\, alongside (but as a separate filing from) the JPK_V7M VA
 T return.\n\nPenalty: Fine for a fiscal offence (wykroczenie skarbowe) und
 er the Fiscal Penal Code (Kodeks karny skarbowy) for late or missing VAT-U
 E filings.\n\nNote: Re-checked 2026-09-09: podatki.gov.pl/vat/wyjasnienia/
 informacje-podsumowujace-vat-ue still returns a 404 (site restructure). Th
 e 25th-of-month deadline and Art. 100 legal basis remain well-established 
 VAT law\, cross-checked against JPK_V7M's confirmed same-day deadline\; no
 t independently re-confirmed against a live official page.\n\nStatus: Conf
 irmed\nhttps://eudeadlines.eu/deadline/pl-vat-ue-summary-monthly
URL:https://eudeadlines.eu/deadline/pl-vat-ue-summary-monthly
CATEGORIES:PL,Poland VAT-UE summary information
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland VAT-UE summary information: Poland: VAT-UE summary infor
 mation (informacja podsumowująca) due by the 25th — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland VAT-UE summary information: Poland: VAT-UE summary infor
 mation (informacja podsumowująca) due by the 25th — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eu-empco-green-claims-transposition@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20260927
DTEND;VALUE=DATE:20260928
SUMMARY:Empowering Consumers for the Green Transition Directive: Empowering
  Consumers for the Green Transition: ban on vague/unsubstantiated environm
 ental claims applies
DESCRIPTION:Directive (EU) 2024/825 amends EU consumer-protection law (the 
 Unfair Commercial Practices Directive and the Consumer Rights Directive) t
 o ban generic environmental claims not backed by recognised excellent envi
 ronmental performance (e.g. 'climate neutral'\, 'eco-friendly'\, 'green' u
 sed without substantiation)\, bans claims based purely on carbon-offsettin
 g\, and requires sustainability labels to come from a certification scheme
  or a public authority rather than being self-created. It also bans planne
 d-obsolescence practices and requires clearer product durability/reparabil
 ity information.\n\nWho is affected: Any business making environmental or 
 sustainability claims\, or displaying sustainability labels\, on products 
 or in marketing aimed at EU consumers — most directly online retailers a
 nd manufacturers/importers of physical goods.\n\nWhat to do: Audit product
  pages\, packaging and marketing copy for generic green claims and either 
 substantiate them against a recognised standard or remove them. Stop using
  offset-based 'carbon neutral' claims without the required disclosure. Che
 ck that any sustainability label used comes from a certification scheme or
  public authority\, not a self-created label. Add durability/reparability 
 information to product listings.\n\nPenalty: Set nationally under the Unfa
 ir Commercial Practices Directive enforcement framework\, proportionate to
  turnover in the Member State concerned\n\nNote: Directive (EU) 2024/825 r
 equired Member States to transpose by 2026-03-27 and to apply the national
  transposing measures from 2026-09-27 (Art. 7).\n\nStatus: Confirmed\nhttp
 s://eudeadlines.eu/deadline/eu-empco-green-claims-transposition
URL:https://eudeadlines.eu/deadline/eu-empco-green-claims-transposition
CATEGORIES:EU,Empowering Consumers for the Green Transition Directive
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Empowering Consumers for the Green Transition Directive: Empowe
 ring Consumers for the Green Transition: ban on vague/unsubstantiated envi
 ronmental claims applies — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Empowering Consumers for the Green Transition Directive: Empowe
 ring Consumers for the Green Transition: ban on vague/unsubstantiated envi
 ronmental claims applies — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-edoreczenia-ceidg-mandatory-2026@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20261001
DTEND;VALUE=DATE:20261002
SUMMARY:Poland e-Doręczenia (Ustawa o doręczeniach elektronicznych): Pola
 nd: e-Doręczenia address becomes mandatory for CEIDG businesses registere
 d before 2025
DESCRIPTION:From 1 October 2026\, sole traders and other businesses registe
 red in Poland's CEIDG (Central Registration and Information on Business) b
 efore 1 January 2025 must hold and use a registered electronic delivery (e
 -Doręczenia) address for official correspondence with public authorities\
 , completing the phased rollout that already covers new CEIDG registration
 s\, KRS-registered companies and public-trust professions.\n\nWho is affec
 ted: Sole traders (jednoosobowa działalność gospodarcza) and other CEID
 G-registered businesses in Poland that registered before 1 January 2025 an
 d have not already set up an e-Doręczenia address.\n\nWhat to do: Set up 
 your e-Doręczenia address via the mObywatel app\, biznes.gov.pl\, or a Tr
 usted Profile-based application before 1 October 2026\, and start monitori
 ng the address for official correspondence\, which will otherwise be deliv
 ered by public notice after a failed delivery attempt.\n\n\nNote: Applies 
 to sole traders/businesses registered in CEIDG before 1 January 2025. Busi
 nesses registering in CEIDG from 1 January 2025 onward\, and any pre-2025 
 CEIDG entrepreneur who filed a CEIDG update request after 30 June 2025\, a
 lready had to set up an e-Doręczenia address earlier. Companies registere
 d in the KRS had an earlier deadline: 1 April 2025 for those registered be
 fore 1 January 2025\, and immediately at registration from 1 January 2025 
 for new KRS entities.\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadlin
 e/pl-edoreczenia-ceidg-mandatory-2026
URL:https://eudeadlines.eu/deadline/pl-edoreczenia-ceidg-mandatory-2026
CATEGORIES:PL,Poland e-Doręczenia (Ustawa o doręczeniach elektronicznych)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland e-Doręczenia (Ustawa o doręczeniach elektronicznych): 
 Poland: e-Doręczenia address becomes mandatory for CEIDG businesses regis
 tered before 2025 — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland e-Doręczenia (Ustawa o doręczeniach elektronicznych): 
 Poland: e-Doręczenia address becomes mandatory for CEIDG businesses regis
 tered before 2025 — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-vat-oss-quarterly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:Poland VAT OSS (Unijna procedura One Stop Shop): Poland: VAT OSS Un
 ion-scheme return and payment due by the end of the month after each quart
 er
RRULE:FREQ=MONTHLY;INTERVAL=3;BYMONTHDAY=-1
DESCRIPTION:Businesses registered for the EU VAT One Stop Shop (OSS) Union 
 scheme must file a single quarterly VAT return covering their B2C cross-bo
 rder sales of goods or services to consumers in other EU member states\, a
 nd pay any VAT due\, via the Polish OSS portal by the last day of the mont
 h following each calendar quarter.\n\nWho is affected: Poland-registered e
 -commerce and services businesses selling goods or digital/other services 
 to consumers in other EU countries that have opted into the Union OSS sche
 me instead of registering for VAT separately in each destination country.\
 n\nWhat to do: If registered for OSS\, prepare and submit the OSS VAT retu
 rn through the podatki.gov.pl e-Deklaracje portal by the last day of the m
 onth after each quarter (30 April\, 31 July\, 31 October\, 31 January)\, a
 nd pay the VAT due across all covered member states in one payment.\n\nPen
 alty: Late filing or payment risks exclusion from the OSS scheme (wyrejest
 rowanie z procedury OSS)\, which would then require separate VAT registrat
 ion in each EU consumption country\, plus possible penal sanctions in thos
 e countries.\n\nNote: Re-checked 2026-09-09: podatki.gov.pl/vat/vat-oss/pr
 ocedura-unijna-oss still returns a 404 (site restructure). The end-of-mont
 h-after-quarter deadline is the well-established EU-wide OSS rule\, consis
 tent with the same rule confirmed elsewhere in this dataset (e.g. Lithuani
 a\, Estonia)\; not independently re-confirmed against podatki.gov.pl this 
 session.\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/pl-vat-oss-
 quarterly
URL:https://eudeadlines.eu/deadline/pl-vat-oss-quarterly
CATEGORIES:PL,Poland VAT OSS (Unijna procedura One Stop Shop)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland VAT OSS (Unijna procedura One Stop Shop): Poland: VAT OS
 S Union-scheme return and payment due by the end of the month after each q
 uarter — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland VAT OSS (Unijna procedura One Stop Shop): Poland: VAT OS
 S Union-scheme return and payment due by the end of the month after each q
 uarter — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:ai-act-legacy-watermarking-grace-end@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20261202
DTEND;VALUE=DATE:20261203
SUMMARY:AI Act: end of grace period for marking AI-generated content in pre
 -existing systems\; ban on non-consensual intimate deepfake generators
DESCRIPTION:Generative AI systems that were already on the market before 2 
 August 2026 get until 2 December 2026 to implement machine-readable markin
 g and detection of AI-generated output. From the same date AI systems buil
 t to generate non-consensual intimate or sexual imagery are prohibited out
 right.\n\nWho is affected: Providers of generative AI products released be
 fore August 2026 that have not yet implemented watermarking\; any business
  deploying image or video generators.\n\nWhat to do: Confirm that every ge
 nerative feature you provide emits watermarks or provenance metadata by 2 
 December 2026. Check vendor roadmaps if you resell or embed third-party ge
 nerators. Remove or block any functionality that could generate intimate i
 magery of real people.\n\nPenalty: Up to €15M or 3% of worldwide turnove
 r\; prohibited practices up to €35M or 7%\n\nNote: Grace period introduc
 ed by the Digital Omnibus on AI (Reg. 2026/1744) for systems placed on the
  market before 2026-08-02\; the new prohibition was also added by the Omni
 bus\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/ai-act-legacy-wa
 termarking-grace-end
URL:https://eudeadlines.eu/deadline/ai-act-legacy-watermarking-grace-end
CATEGORIES:EU,EU AI Act
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: end of grace period for marking AI-generated content in
  pre-existing systems\; ban on non-consensual intimate deepfake generators
  — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: end of grace period for marking AI-generated content in
  pre-existing systems\; ban on non-consensual intimate deepfake generators
  — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:platform-work-directive-transposition@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20261202
DTEND;VALUE=DATE:20261203
SUMMARY:Platform Work Directive: presumption of employment and algorithmic-
 management rules must apply nationally
DESCRIPTION:Directive (EU) 2024/2831 must be transposed by 2 December 2026.
  Digital labour platforms face a rebuttable presumption that their workers
  are employees where the platform controls the work\, must be transparent 
 about automated monitoring and decision systems\, keep humans in the loop 
 for decisions like account suspension\, and may not process certain person
 al data (emotions\, private chats).\n\nWho is affected: Any platform that 
 organises work performed by individuals through an app or website (deliver
 y\, ride-hailing\, cleaning\, freelance marketplaces)\, including small pl
 atforms\; only Italy and Spain had draft laws by mid-2026.\n\nWhat to do: 
 Assess whether your contractors would be presumed employees under the nati
 onal test and budget for reclassification. Document every automated system
  that affects pay\, tasks or access\, prepare worker-facing explanations\,
  and set up human review of significant decisions. Track your Member State
 's transposition law.\n\nPenalty: Set nationally\; reclassification costs 
 and back-payments of social contributions\n\n\nStatus: Confirmed\nhttps://
 eudeadlines.eu/deadline/platform-work-directive-transposition
URL:https://eudeadlines.eu/deadline/platform-work-directive-transposition
CATEGORIES:EU,Platform Work Directive
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Platform Work Directive: presumption of employment and algorith
 mic-management rules must apply nationally — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Platform Work Directive: presumption of employment and algorith
 mic-management rules must apply nationally — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:product-liability-directive-software@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20261209
DTEND;VALUE=DATE:20261210
SUMMARY:Product Liability Directive: New Product Liability Directive applie
 s: strict liability extends to software\, AI and digital services
DESCRIPTION:Directive (EU) 2024/2853 must be transposed by 9 December 2026 
 and applies to products placed on the market after that date. Software (in
 cluding SaaS and AI)\, digital manufacturing files and related services co
 unt as products\; missing security updates can make a product defective. C
 ourts can order disclosure of evidence and presume defectiveness in comple
 x cases. Free open-source software outside commercial activity is excluded
 .\n\nWho is affected: Manufacturers of any product\, software developers a
 nd SaaS providers\, importers\, fulfilment providers and\, where no EU man
 ufacturer exists\, online marketplaces and distributors.\n\nWhat to do: Re
 view product liability insurance to cover software and cyber-related defec
 ts. Set up a security-update policy and document it. Keep technical docume
 ntation and test records so you can respond to disclosure orders. Importer
 s: make sure non-EU suppliers have an EU authorised representative\, other
 wise you carry the liability.\n\nPenalty: No fines – unlimited civil lia
 bility for death\, injury\, property damage and data loss\n\n\nStatus: Con
 firmed\nhttps://eudeadlines.eu/deadline/product-liability-directive-softwa
 re
URL:https://eudeadlines.eu/deadline/product-liability-directive-software
CATEGORIES:EU,Product Liability Directive
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Product Liability Directive: New Product Liability Directive ap
 plies: strict liability extends to software\, AI and digital services — 
 due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Product Liability Directive: New Product Liability Directive ap
 plies: strict liability extends to software\, AI and digital services — 
 due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eudi-wallet-member-states-launch@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20261224
DTEND;VALUE=DATE:20261225
SUMMARY:eIDAS 2: EU Digital Identity Wallet: every Member State must offer 
 a wallet\; public bodies must accept it
DESCRIPTION:Each EU country must provide at least one certified EU Digital 
 Identity Wallet so citizens and businesses can identify themselves\, sign 
 documents with qualified e-signatures and share verified attributes (compa
 ny registration\, licences) across the EU. Public administrations must acc
 ept it for online services.\n\nWho is affected: No direct obligation on pr
 ivate businesses yet\; companies dealing with public authorities and those
  doing KYC/onboarding should prepare to accept wallet-based identification
 .\n\nWhat to do: Plan wallet acceptance in customer onboarding and e-signa
 ture flows (OpenID4VP / OpenID4VCI standards). Check whether your national
  wallet offers business attributes you could use for procurement\, banking
  or licensing.\n\n\nNote: 24 months after the implementing regulations of 
 2024-11-28 (Art. 5a Reg. 2024/1183)\; the Commission communicates it as 'e
 nd of 2026'\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/eudi-wal
 let-member-states-launch
URL:https://eudeadlines.eu/deadline/eudi-wallet-member-states-launch
CATEGORIES:EU,eIDAS 2
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:eIDAS 2: EU Digital Identity Wallet: every Member State must of
 fer a wallet\; public bodies must accept it — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:eIDAS 2: EU Digital Identity Wallet: every Member State must of
 fer a wallet\; public bodies must accept it — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-jpk-cit-final-phase-2027@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:Poland JPK_CIT / JPK_KR_PD (structured accounting books): Poland: J
 PK_CIT digital accounting-books reporting becomes mandatory for remaining 
 CIT taxpayers
DESCRIPTION:From fiscal years starting after 31 December 2026\, all remaini
 ng CIT taxpayers in Poland (those not already captured by the 2025 or 2026
  phases) must keep their statutory accounting books in electronic form and
  submit them to the tax office in the JPK_KR_PD structured format\, alongs
 ide the JPK_ST_KR fixed-asset register\, completing the phased digitalisat
 ion of corporate accounting records.\n\nWho is affected: Polish CIT taxpay
 ers\, including smaller companies and non-legal-person entities keeping ac
 counting books\, not already brought into scope by the 2025 (large taxpaye
 rs/tax capital groups) or 2026 (other JPK_VAT-obligated CIT payers) phases
 .\n\nWhat to do: Confirm which JPK_CIT phase applies to your entity based 
 on your CIT-payer category (note: VAT-registered CIT payers may already be
  in an earlier phase than this entry's 2027 date -- see dateNote)\, and ch
 eck that your accounting software can export the JPK_KR_PD and JPK_ST_KR s
 tructures (which also carry KSeF invoice numbers and counterparty NIP data
 ). Since the 15 May 2026 CIT Act amendment (in force 2026-07-01)\, the fir
 st structured submission is due by the end of the 7th month after the rele
 vant fiscal year ends (not alongside CIT-8 as before) -- plan accordingly.
 \n\nPenalty: Standard Tax Ordinance (Ordynacja podatkowa) penalties for la
 te or incorrect JPK filings\, plus increased tax-audit exposure since the 
 tax authority can cross-check JPK_KR_PD data against KSeF invoices.\n\nNot
 e: Updated 2026-09-09: primary-source-confirmed via api.sejm.gov.pl -- the
  Ustawa z dnia 15 maja 2026 r. (Dz.U. 2026 poz. 779)\, in force 2026-07-01
 \, amended the CIT Act's JPK_CIT submission-deadline provision. The submis
 sion deadline for the structured accounting books is no longer tied to the
  CIT-8 filing deadline\; it is now "do końca siódmego miesiąca po zako
 ńczeniu roku podatkowego" (the end of the 7th month after the tax year en
 ds) -- e.g. 31 July for a calendar-year filer\, not ~31 March. This entry'
 s 2027-01-01 date still correctly marks when the final phase (remaining CI
 T taxpayers) becomes obligated to keep the books electronically\, but the 
 first SUBMISSION under that phase now falls around 31 July 2028 (7 months 
 after the FY2027 year-end)\, not alongside CIT-8 the following spring. Sep
 arately: this entry only models the final (2027) phase. A small VAT-regist
 ered CIT taxpayer (e.g. a small SaaS or e-commerce sp. z o.o. already fili
 ng JPK_V7M) plausibly falls into the EARLIER "other CIT payers already obl
 igated to file JPK_VAT" phase (tax years starting after 31 Dec 2025\, i.e.
  FY2026)\, which is not represented by a separate dataset entry -- this ph
 ase-2 gap could not be independently confirmed to primary-source standard 
 this session (podatki.gov.pl's JPK page loaded with no extractable article
  text) and is flagged for a follow-up audit rather than guessed at.\n\nSta
 tus: Confirmed\nhttps://eudeadlines.eu/deadline/pl-jpk-cit-final-phase-202
 7
URL:https://eudeadlines.eu/deadline/pl-jpk-cit-final-phase-2027
CATEGORIES:PL,Poland JPK_CIT / JPK_KR_PD (structured accounting books)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland JPK_CIT / JPK_KR_PD (structured accounting books): Polan
 d: JPK_CIT digital accounting-books reporting becomes mandatory for remain
 ing CIT taxpayers — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland JPK_CIT / JPK_KR_PD (structured accounting books): Polan
 d: JPK_CIT digital accounting-books reporting becomes mandatory for remain
 ing CIT taxpayers — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-minimum-wage-2027-proposed@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:[indicative date] Poland minimum wage: Poland: 2027 minimum wage pr
 oposed at PLN 4\,950\; final regulation due by 15 September 2026
DESCRIPTION:The Polish government has proposed a 2027 minimum monthly wage 
 of PLN 4\,950 gross (up from PLN 4\,806 in 2026) and a minimum hourly rate
  of PLN 32.30\, after trade unions sought PLN 5\,200 and employer groups s
 ought a smaller rise\; the Council of Ministers must issue the final regul
 ation no later than 15 September 2026.\n\nWho is affected: Every employer 
 in Poland with staff paid at or near the minimum wage\, regardless of sect
 or.\n\nWhat to do: Budget 2027 payroll around the proposed PLN 4\,950 mont
 hly / PLN 32.30 hourly floor (the legal minimum the government can set)\, 
 and check gov.pl/web/rodzina or the Journal of Laws in the coming weeks fo
 r the final Council of Ministers regulation confirming the exact 2027 figu
 res before finalising payroll systems.\n\n\nNote: The Rada Dialogu Społec
 znego (Social Dialogue Council) did not reach a unanimous position\, so un
 der the Minimum Wage Act the Council of Ministers must set the 2027 figure
  by regulation no later than 15 September 2026\, and cannot set it below t
 he PLN 4\,950 gross / PLN 32.30 hourly figure it already proposed to the s
 ocial partners. As of this run (2026-09-08)\, the confirming Dziennik Usta
 w regulation had not yet been published - treat PLN 4\,950 as the legal fl
 oor\, not yet the final confirmed figure.\n\nStatus: Proposed\nhttps://eud
 eadlines.eu/deadline/pl-minimum-wage-2027-proposed
URL:https://eudeadlines.eu/deadline/pl-minimum-wage-2027-proposed
CATEGORIES:PL,Poland minimum wage
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland minimum wage: Poland: 2027 minimum wage proposed at PLN 
 4\,950\; final regulation due by 15 September 2026 — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland minimum wage: Poland: 2027 minimum wage proposed at PLN 
 4\,950\; final regulation due by 15 September 2026 — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:data-act-cloud-switching-fees-end@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270112
DTEND;VALUE=DATE:20270113
SUMMARY:Data Act: cloud providers must stop charging switching and data-egr
 ess fees
DESCRIPTION:From this date cloud and data-processing providers may no longe
 r charge customers for switching to another provider or for exporting thei
 r data (egress). Contracts must already allow termination and migration wi
 thin 30 days\, and providers must offer export in machine-readable formats
 .\n\nWho is affected: All cloud\, SaaS\, PaaS and hosting providers servin
 g EU customers\; every business that buys cloud services benefits.\n\nWhat
  to do: Providers: remove egress and switching charges from price lists an
 d contracts\, and publish exit assistance terms. Customers: review cloud c
 ontracts for exit clauses and use the rules to negotiate migrations\; plan
  any provider change for after January 2027 to avoid egress costs.\n\n\n\n
 Status: Confirmed\nhttps://eudeadlines.eu/deadline/data-act-cloud-switchin
 g-fees-end
URL:https://eudeadlines.eu/deadline/data-act-cloud-switching-fees-end
CATEGORIES:EU,Data Act
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Data Act: cloud providers must stop charging switching and data
 -egress fees — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Data Act: cloud providers must stop charging switching and data
 -egress fees — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:machinery-regulation-applies@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270120
DTEND;VALUE=DATE:20270121
SUMMARY:Machinery Regulation replaces the Machinery Directive: new CE requi
 rements including cybersecurity and software
DESCRIPTION:Regulation (EU) 2023/1230 applies to all machinery placed on th
 e EU market from 20 January 2027 with no transition. It adds requirements 
 for software safety\, protection against malicious tampering\, self-evolvi
 ng (AI) behaviour\, digital instructions\, and mandatory third-party asses
 sment for certain high-risk machinery categories.\n\nWho is affected: Manu
 facturers\, importers and distributors of machines\, robots\, lifting equi
 pment\, partly completed machinery and safety components (including safety
  software)\, of any size.\n\nWhat to do: Gap-assess existing machine model
 s against Annex III essential requirements\, especially cybersecurity and 
 control-system software. Update technical files\, risk assessments and dec
 larations of conformity\; check whether your product is in Annex I Part A 
 requiring a notified body. Decide on digital vs paper instructions (paper 
 still on request).\n\nPenalty: Set nationally\; non-compliant machinery ca
 nnot be placed on the market\n\n\nStatus: Confirmed\nhttps://eudeadlines.e
 u/deadline/machinery-regulation-applies
URL:https://eudeadlines.eu/deadline/machinery-regulation-applies
CATEGORIES:EU,Machinery Regulation
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Machinery Regulation replaces the Machinery Directive: new CE r
 equirements including cybersecurity and software — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Machinery Regulation replaces the Machinery Directive: new CE r
 equirements including cybersecurity and software — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-pit-annual-info-returns-jan31@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:Poland PIT employer annual information returns: Poland: annual PIT-
 11\, PIT-4R and PIT-8AR employer information returns due 31 January (to th
 e tax office)
RRULE:FREQ=YEARLY;BYMONTH=1;BYMONTHDAY=-1
DESCRIPTION:Employers acting as PIT withholding agents (płatnik) must elec
 tronically submit the annual PIT-11 statements (one per employee\, coverin
 g salary and PIT advances withheld during the year)\, plus the aggregate P
 IT-4R return (employee PIT advances) and PIT-8AR return (flat-rate withhol
 ding tax\, if applicable) to the tax office by 31 January of the following
  year.\n\nWho is affected: Every Poland-registered employer that withheld 
 PIT advances on employee salaries\, board-member remuneration\, or other P
 IT-withholdable payments during the year.\n\nWhat to do: Close out the yea
 r's payroll records\, generate PIT-11 statements for each employee and the
  aggregate PIT-4R (and PIT-8AR if applicable)\, and submit them electronic
 ally via e-Deklaracje/e-Urząd Skarbowy to the tax office by 31 January.\n
 \nPenalty: Fine of up to 180 daily rates under the Fiscal Penal Code (Kode
 ks karny skarbowy) for late or missing annual PIT information returns.\n\n
 Note: Re-checked 2026-09-09: podatki.gov.pl/pit/dla-pracodawcy-platnika/ob
 owiazki-platnika still returns a 404 (site restructure). The 31 January el
 ectronic-filing deadline is well-established\, stable PIT law\; not indepe
 ndently re-confirmed against a live official page this session.\n\nStatus:
  Confirmed\nhttps://eudeadlines.eu/deadline/pl-pit-annual-info-returns-jan
 31
URL:https://eudeadlines.eu/deadline/pl-pit-annual-info-returns-jan31
CATEGORIES:PL,Poland PIT employer annual information returns
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PIT employer annual information returns: Poland: annual 
 PIT-11\, PIT-4R and PIT-8AR employer information returns due 31 January (t
 o the tax office) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PIT employer annual information returns: Poland: annual 
 PIT-11\, PIT-4R and PIT-8AR employer information returns due 31 January (t
 o the tax office) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-zus-iwa-annual@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270131
DTEND;VALUE=DATE:20270201
SUMMARY:Poland ZUS IWA accident-insurance information: Poland: ZUS IWA acci
 dent-insurance information due 31 January (employers averaging 10+ insured
 )
RRULE:FREQ=YEARLY;BYMONTH=1;BYMONTHDAY=-1
DESCRIPTION:Employers that reported an average of at least 10 people to acc
 ident insurance per month in the prior calendar year (and were registered 
 for accident insurance for at least one person on at least one day in Janu
 ary of the current year) must submit the ZUS IWA information form by 31 Ja
 nuary\, used to set their individual accident-insurance contribution rate.
 \n\nWho is affected: Poland-registered employers with average monthly acci
 dent-insurance coverage of at least 10 insured persons (including the paye
 r) in the prior year - typically mid-sized and larger employers\; not rele
 vant to a 3-person company.\n\nWhat to do: Check whether average accident-
 insurance coverage reached 10 persons/month in the prior year\; if so\, pr
 epare and submit the ZUS IWA form electronically via the Płatnik/PUE syst
 em by 31 January.\n\nPenalty: The employer's individual accident-insurance
  contribution rate is increased by 50% for the following contribution year
  if ZUS IWA is not submitted on time.\n\nNote: Gemini candidate audit (202
 6-09-08)\, confidence: verified against zus.pl directly this session.\n\nS
 tatus: Confirmed\nhttps://eudeadlines.eu/deadline/pl-zus-iwa-annual
URL:https://eudeadlines.eu/deadline/pl-zus-iwa-annual
CATEGORIES:PL,Poland ZUS IWA accident-insurance information
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland ZUS IWA accident-insurance information: Poland: ZUS IWA 
 accident-insurance information due 31 January (employers averaging 10+ ins
 ured) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland ZUS IWA accident-insurance information: Poland: ZUS IWA 
 accident-insurance information due 31 January (employers averaging 10+ ins
 ured) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:battery-passport-qr@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270218
DTEND;VALUE=DATE:20270219
SUMMARY:Battery Regulation: Digital battery passport mandatory for EV\, lig
 ht-transport and industrial batteries above 2 kWh
DESCRIPTION:Under Regulation (EU) 2023/1542 every EV battery\, light means 
 of transport battery (e-bikes\, scooters) and industrial battery over 2 kW
 h placed on the market must carry a QR code linking to a digital battery p
 assport with data on chemistry\, carbon footprint\, recycled content\, per
 formance and durability.\n\nWho is affected: Manufacturers and importers o
 f EV batteries\, light-means-of-transport batteries (e-bikes\, scooters) a
 nd industrial batteries above 2 kWh\, and of products built with them (e-b
 ikes\, energy-storage systems\, forklifts\, EVs)\; distributors must check
  the QR code is present. Ordinary consumer batteries (e.g. AA/AAA\, phone 
 or laptop batteries) and products containing only those are out of scope.\
 n\nWhat to do: Decide who holds the passport data (you or your cell suppli
 er) and pick a passport service provider. Collect the mandatory data set p
 er battery model\, set up unique identifiers and QR codes on the product\,
  and plan for updating state-of-health data over the battery's life.\n\nPe
 nalty: Set nationally\; non-compliant batteries can be withdrawn from the 
 market\n\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/battery-pas
 sport-qr
URL:https://eudeadlines.eu/deadline/battery-passport-qr
CATEGORIES:EU,Battery Regulation
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Battery Regulation: Digital battery passport mandatory for EV\,
  light-transport and industrial batteries above 2 kWh — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Battery Regulation: Digital battery passport mandatory for EV\,
  light-transport and industrial batteries above 2 kWh — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-kobize-annual-report@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270228
DTEND;VALUE=DATE:20270301
SUMMARY:Poland KOBiZE national emissions database report: Poland: annual re
 port to the national GHG/emissions database (KOBiZE) due by end of Februar
 y
RRULE:FREQ=YEARLY;BYMONTH=2;BYMONTHDAY=-1
DESCRIPTION:Entities operating an installation or other source that emits g
 ases or other substances into the air (including company vehicle fleets an
 d heating/generator sources above minimal thresholds) must report their pr
 ior-year emissions to KOBiZE's national database (Krajowa baza o emisjach)
  by the end of February.\n\nWho is affected: Businesses operating emission
  sources in Poland - in practice this reaches far beyond heavy industry\, 
 since it covers company vehicle fleets and building heating/generator equi
 pment above minor thresholds\, making it a commonly overlooked obligation 
 for ordinary office-based companies.\n\nWhat to do: Inventory emission sou
 rces (vehicles\, boilers\, generators\, etc.) used during the prior calend
 ar year\, register in the KOBiZE database if not already registered\, and 
 submit the annual report by the end of February.\n\nPenalty: Liability for
  an offence against the environment (wykroczenie) under the Act on the gre
 enhouse gas emissions management system.\n\nNote: Confirmed 2026-09-09 via
  kobize.pl's own "Informacja ogólna" page: "Informacje wymienione w punkt
 ach 1-12 dotyczące poprzedniego roku kalendarzowego są wprowadzane do Kr
 ajowej bazy przez podmioty korzystające ze środowiska w raportach roczny
 ch składanych do końca lutego każdego roku" (prior-year data is submitt
 ed in annual reports filed by the end of February each year) -- matches th
 e dataset's end-of-February deadline.\n\nStatus: Confirmed\nhttps://eudead
 lines.eu/deadline/pl-kobize-annual-report
URL:https://eudeadlines.eu/deadline/pl-kobize-annual-report
CATEGORIES:PL,Poland KOBiZE national emissions database report
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland KOBiZE national emissions database report: Poland: annua
 l report to the national GHG/emissions database (KOBiZE) due by end of Feb
 ruary — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland KOBiZE national emissions database report: Poland: annua
 l report to the national GHG/emissions database (KOBiZE) due by end of Feb
 ruary — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-pit11-employee-copy-feb-end@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270228
DTEND;VALUE=DATE:20270301
SUMMARY:Poland PIT employer information to employees: Poland: PIT-11 statem
 ent must be provided to each employee by the end of February
RRULE:FREQ=YEARLY;BYMONTH=2;BYMONTHDAY=-1
DESCRIPTION:Separately from the 31 January electronic filing to the tax off
 ice\, employers must also give each employee their individual PIT-11 state
 ment (showing salary and PIT advances withheld during the year) by the end
  of February\, so employees can prepare their own annual PIT return.\n\nWh
 o is affected: Every Poland-registered employer that withheld PIT advances
  on employee salaries or other PIT-withholdable payments during the year.\
 n\nWhat to do: Deliver the PIT-11 statement to each employee (electronical
 ly\, e.g. via employee portal or email\, or in paper form) by the last day
  of February\, distinct from and in addition to the 31 January electronic 
 submission to the tax office.\n\nPenalty: Fine under the Fiscal Penal Code
  (Kodeks karny skarbowy) for failing to provide the PIT-11 statement to th
 e employee on time.\n\nNote: Re-checked 2026-09-09: podatki.gov.pl/pit/dla
 -pracodawcy-platnika/obowiazki-platnika still returns a 404 (site restruct
 ure\, same page as pl-pit-annual-info-returns-jan31). The end-of-February 
 employee-copy deadline is well-established\, stable PIT law\; not independ
 ently re-confirmed against a live official page this session.\n\nStatus: C
 onfirmed\nhttps://eudeadlines.eu/deadline/pl-pit11-employee-copy-feb-end
URL:https://eudeadlines.eu/deadline/pl-pit11-employee-copy-feb-end
CATEGORIES:PL,Poland PIT employer information to employees
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PIT employer information to employees: Poland: PIT-11 st
 atement must be provided to each employee by the end of February — due i
 n 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland PIT employer information to employees: Poland: PIT-11 st
 atement must be provided to each employee by the end of February — due i
 n 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-bdo-annual-report-yearly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270315
DTEND;VALUE=DATE:20270316
SUMMARY:Poland BDO packaging/EPR annual report: Poland: annual BDO report o
 n packaging and products due 15 March
RRULE:FREQ=YEARLY;BYMONTH=3;BYMONTHDAY=15
DESCRIPTION:Businesses that place packaging\, packaged products\, or specif
 ied products (e.g. batteries\, electrical/electronic equipment\, vehicles)
  on the Polish market\, or that generate or manage waste\, must file an an
 nual report through the BDO electronic register by 15 March covering the p
 revious calendar year\, including packaging-recycling and extended-produce
 r-responsibility (EPR) data.\n\nWho is affected: Companies introducing pac
 kaging\, packaged goods\, batteries\, electrical/electronic equipment or v
 ehicles onto the Polish market\, and waste generators/handlers registered 
 in BDO.\n\nWhat to do: Confirm your BDO account and registration are up to
  date\, gather packaging-placed and recycling data for the reporting year\
 , and submit the annual report(s) (products/packaging and\, if applicable\
 , waste) via bdo.mos.gov.pl before 15 March.\n\nPenalty: Fines under the W
 aste Act (Ustawa o odpadach) for failing to submit the BDO report\, submit
 ting it late\, or submitting inaccurate data.\n\n\nStatus: Confirmed\nhttp
 s://eudeadlines.eu/deadline/pl-bdo-annual-report-yearly
URL:https://eudeadlines.eu/deadline/pl-bdo-annual-report-yearly
CATEGORIES:PL,Poland BDO packaging/EPR annual report
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland BDO packaging/EPR annual report: Poland: annual BDO repo
 rt on packaging and products due 15 March — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland BDO packaging/EPR annual report: Poland: annual BDO repo
 rt on packaging and products due 15 March — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-cit8-annual-return-yearly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:Poland CIT-8 annual return: Poland: annual CIT-8 corporate income t
 ax return due by 31 March
RRULE:FREQ=YEARLY;BYMONTH=3;BYMONTHDAY=-1
DESCRIPTION:Poland CIT taxpayers with a calendar financial year must file t
 heir annual CIT-8 corporate income tax return within 3 months of financial
  year-end - 31 March for a standard 1 January-31 December year - reconcili
 ng the year's CIT advances against the final liability.\n\nWho is affected
 : All Poland-registered CIT taxpayers (sp. z o.o.\, S.A. and other CIT pay
 ers) with a calendar financial year.\n\nWhat to do: Close the books\, comp
 ute the annual CIT liability against advances already paid\, and file CIT-
 8 electronically by 31 March. Companies whose non-calendar financial year 
 ends on a different date must file within 3 months of their own year-end i
 nstead.\n\nPenalty: Fines under the Fiscal Penal Code (Kodeks karny skarbo
 wy) for late or missing CIT-8 filings\, plus late-payment interest under t
 he Tax Ordinance on any balance due.\n\n\nStatus: Confirmed\nhttps://eudea
 dlines.eu/deadline/pl-cit8-annual-return-yearly
URL:https://eudeadlines.eu/deadline/pl-cit8-annual-return-yearly
CATEGORIES:PL,Poland CIT-8 annual return
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland CIT-8 annual return: Poland: annual CIT-8 corporate inco
 me tax return due by 31 March — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland CIT-8 annual return: Poland: annual CIT-8 corporate inco
 me tax return due by 31 March — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-environmental-fee-annual@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270331
DTEND;VALUE=DATE:20270401
SUMMARY:Poland environmental-use fee (opłata za korzystanie ze środowiska
 ): Poland: annual environmental-use fee (opłata za korzystanie ze środow
 iska) due by 31 March
RRULE:FREQ=YEARLY;BYMONTH=3;BYMONTHDAY=-1
DESCRIPTION:Entities that use the environment in a way requiring a fee (e.g
 . emissions from company vehicles\, water abstraction\, or waste storage) 
 must calculate and pay the annual environmental-use fee to the relevant ma
 rshal's office (Urząd Marszałkowski) by 31 March\, covering the prior ca
 lendar year. A de-minimis exemption applies below a small annual fee thres
 hold.\n\nWho is affected: Businesses operating vehicles or other emission/
 water-use sources in Poland above the de-minimis threshold - like the KOBi
 ZE report\, this reaches beyond heavy industry to ordinary companies with 
 a company vehicle fleet.\n\nWhat to do: Calculate the prior year's environ
 mental fee based on emission/water-use sources\; if above the de-minimis t
 hreshold\, submit the report and pay via the marshal's office by 31 March.
 \n\nPenalty: Late-payment interest\, plus administrative fines under the E
 nvironmental Protection Law (Prawo ochrony środowiska) for underpaid or u
 npaid fees.\n\nNote: Re-checked 2026-09-09: gov.pl/web/gov/zloz-sprawozdan
 ie-o-korzystaniu-ze-srodowiska-oraz-wniesionych-oplatach now redirects to 
 the gov.pl homepage (the page appears to have been removed or moved). The 
 31 March deadline and the de-minimis fee threshold could not be independen
 tly re-confirmed this session.\n\nStatus: Confirmed\nhttps://eudeadlines.e
 u/deadline/pl-environmental-fee-annual
URL:https://eudeadlines.eu/deadline/pl-environmental-fee-annual
CATEGORIES:PL,Poland environmental-use fee (opłata za korzystanie ze środ
 owiska)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland environmental-use fee (opłata za korzystanie ze środow
 iska): Poland: annual environmental-use fee (opłata za korzystanie ze śr
 odowiska) due by 31 March — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland environmental-use fee (opłata za korzystanie ze środow
 iska): Poland: annual environmental-use fee (opłata za korzystanie ze śr
 odowiska) due by 31 March — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eudr-micro-small-operators@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:EUDR: EU Deforestation Regulation: due diligence applies for micro 
 and small enterprises
DESCRIPTION:Micro and small companies dealing in the EUDR commodities (catt
 le\, cocoa\, coffee\, palm oil\, rubber\, soy\, wood and derived products)
  get six extra months. Small downstream traders mainly need to collect and
  pass on upstream due diligence reference numbers\; small primary producer
 s in low-risk countries file a simplified declaration.\n\nWho is affected:
  ONLY micro and small importers\, wood and furniture makers\, coffee roast
 ers\, chocolate makers\, printers and retailers that actually deal in EUDR
  Annex I commodities and their derived products: cattle (incl. leather)\, 
 cocoa (incl. chocolate)\, coffee\, palm oil\, rubber (incl. tyres)\, soy\,
  and wood (incl. furniture\, paper\, printed products). This does NOT cove
 r general consumer goods\, electronics\, textiles or other imports/exports
  outside that Annex I list — e.g. a general e-commerce importer of unrel
 ated goods (even one that also imports batteries) is out of scope even tho
 ugh the sector/flag tags below cannot fully exclude that profile.\n\nWhat 
 to do: Check whether your products are listed in EUDR Annex I. Ask supplie
 rs for their due diligence statement reference numbers and keep them for f
 ive years. If you import directly\, register in the EU Information System 
 and prepare geolocation and legality evidence.\n\nPenalty: Fines of at lea
 st 4% of EU turnover\, confiscation of goods\, exclusion from public procu
 rement\n\nNote: Postponed by Regulation (EU) 2025/2650\; micro/small prima
 ry operators in low-risk countries only file a one-off simplified declarat
 ion. Tag scoping clarified 2026-09-08: sectors/flags cannot express 'only 
 these 7 commodities' in this dataset's tag vocabulary\, so a general impor
 ter in the listed sectors can still match by tags alone — read whoIsAffe
 cted below to check whether your actual goods are covered before treating 
 this as applicable.\n\nStatus: Delayed\nhttps://eudeadlines.eu/deadline/eu
 dr-micro-small-operators
URL:https://eudeadlines.eu/deadline/eudr-micro-small-operators
CATEGORIES:EU,EUDR
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EUDR: EU Deforestation Regulation: due diligence applies for mi
 cro and small enterprises — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EUDR: EU Deforestation Regulation: due diligence applies for mi
 cro and small enterprises — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:instant-payments-non-euro-vop@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270709
DTEND;VALUE=DATE:20270710
SUMMARY:Instant Payments Regulation: sending instant euro payments and Veri
 fication of Payee mandatory for non-euro-area banks (Poland\, Sweden\, Cze
 chia\, etc.)
DESCRIPTION:Payment providers in EU countries outside the euro area must of
 fer euro instant transfers and the free name/IBAN check (Verification of P
 ayee) from July 2027\, completing the roll-out across the EU.\n\nWho is af
 fected: Banks and payment institutions in non-euro Member States\; busines
 ses in Poland\, Sweden\, Czechia\, Hungary\, Denmark\, Romania and Bulgari
 a paying or receiving euros.\n\nWhat to do: Businesses in non-euro countri
 es: align supplier and customer master data (legal names vs account holder
 s) ahead of the VoP switch-on to avoid rejected or delayed euro payments\;
  ask your bank about its timetable.\n\n\nNote: Receiving instant euro paym
 ents is mandatory for non-euro-area PSPs from 2027-01-09\; sending and VoP
  from 2027-07-09\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/ins
 tant-payments-non-euro-vop
URL:https://eudeadlines.eu/deadline/instant-payments-non-euro-vop
CATEGORIES:EU,Instant Payments Regulation
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Instant Payments Regulation: sending instant euro payments and 
 Verification of Payee mandatory for non-euro-area banks (Poland\, Sweden\,
  Czechia\, etc.) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Instant Payments Regulation: sending instant euro payments and 
 Verification of Payee mandatory for non-euro-area banks (Poland\, Sweden\,
  Czechia\, etc.) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pl-financial-statements-krs-yearly@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270715
DTEND;VALUE=DATE:20270716
SUMMARY:Poland annual financial statements - KRS/RDF filing: Poland: e-fina
 ncial statements filing to KRS via RDF due within 15 days of approval (by 
 15 July for calendar-year filers)
RRULE:FREQ=YEARLY;BYMONTH=7;BYMONTHDAY=15
DESCRIPTION:Poland-registered companies must prepare their annual financial
  statements\, have them approved by shareholders within 6 months of financ
 ial year-end\, and then file the approved statements free of charge to the
  National Court Register (KRS) via the Repozytorium Dokumentów Finansowyc
 h (RDF) within 15 days of approval. For a calendar financial year that mea
 ns approval by 30 June and filing by 15 July.\n\nWho is affected: All Pola
 nd-registered companies in the KRS (sp. z o.o.\, S.A. and other commercial
  entities) with a calendar financial year.\n\nWhat to do: Prepare the fina
 ncial statements\, obtain shareholder/AGM approval by 30 June\, and submit
  the approved statements (plus the management-board report and\, where app
 licable\, the auditor's opinion) via the free RDF e-service within 15 days
  of approval\, no later than 15 July. If approval is missed\, file the una
 pproved statements by 15 July anyway and re-file within 15 days once they 
 are approved.\n\nPenalty: Fines under the Accounting Act (Ustawa o rachunk
 owości)\; persistent non-filing to the KRS can trigger compulsory-dissolu
 tion (postępowanie przymuszające) proceedings against the company.\n\n\n
 Status: Confirmed\nhttps://eudeadlines.eu/deadline/pl-financial-statements
 -krs-yearly
URL:https://eudeadlines.eu/deadline/pl-financial-statements-krs-yearly
CATEGORIES:PL,Poland annual financial statements - KRS/RDF filing
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland annual financial statements - KRS/RDF filing: Poland: e-
 financial statements filing to KRS via RDF due within 15 days of approval 
 (by 15 July for calendar-year filers) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Poland annual financial statements - KRS/RDF filing: Poland: e-
 financial statements filing to KRS via RDF due within 15 days of approval 
 (by 15 July for calendar-year filers) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:ai-act-gpai-legacy-models@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270802
DTEND;VALUE=DATE:20270803
SUMMARY:AI Act: GPAI models placed on the market before August 2025 must co
 mply
DESCRIPTION:General-purpose AI models that were already on the market befor
 e 2 August 2025 were given two years to catch up. From this date they must
  meet the same documentation\, copyright and training-data-summary duties 
 as new models.\n\nWho is affected: Providers of older foundation models st
 ill offered in the EU\, including companies that fine-tuned and released s
 uch models.\n\nWhat to do: Inventory the models you provide and their rele
 ase dates. Back-fill technical documentation\, downstream information pack
 s and the training-data summary for legacy models\, or withdraw them.\n\nP
 enalty: Up to €15M or 3% of worldwide turnover\n\n\nStatus: Confirmed\nh
 ttps://eudeadlines.eu/deadline/ai-act-gpai-legacy-models
URL:https://eudeadlines.eu/deadline/ai-act-gpai-legacy-models
CATEGORIES:EU,EU AI Act
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: GPAI models placed on the market before August 2025 mus
 t comply — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: GPAI models placed on the market before August 2025 mus
 t comply — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:cbam-first-declaration-certificates@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:CBAM: first annual declaration and surrender of certificates for 20
 26 imports of steel\, aluminium\, cement\, fertilisers
DESCRIPTION:Since 1 January 2026 importers of more than 50 tonnes per year 
 of CBAM goods (iron and steel\, aluminium\, cement\, fertilisers\; plus hy
 drogen and electricity without threshold) must be authorised CBAM declaran
 ts and buy CBAM certificates covering the embedded emissions. The first an
 nual declaration and certificate surrender for 2026 imports is due in 2027
 . Importers under 50 tonnes are exempt but must monitor the threshold.\n\n
 Who is affected: Any business importing the listed goods from outside the 
 EU\, including small manufacturers\, construction firms and traders buying
  steel or aluminium products directly from non-EU suppliers.\n\nWhat to do
 : Track cumulative annual imports of CBAM goods by weight to know if you c
 ross 50 tonnes. If you do\, make sure your authorised declarant status is 
 granted\, collect actual emissions data from suppliers (or use default val
 ues)\, buy certificates during 2027 and file the declaration in the CBAM r
 egistry by the deadline.\n\nPenalty: Penalty per certificate not surrender
 ed\, plus loss of authorisation for repeated breaches\n\nNote: Definitive 
 period started 2026-01-01\; importers above 50 tonnes/year had to apply fo
 r authorised CBAM declarant status by 2026-03-31. Declaration deadline per
  the 2025 CBAM simplification regulation – confirm with your national CB
 AM authority\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/cbam-fi
 rst-declaration-certificates
URL:https://eudeadlines.eu/deadline/cbam-first-declaration-certificates
CATEGORIES:EU,CBAM
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:CBAM: first annual declaration and surrender of certificates fo
 r 2026 imports of steel\, aluminium\, cement\, fertilisers — due in 7 da
 ys
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:CBAM: first annual declaration and surrender of certificates fo
 r 2026 imports of steel\, aluminium\, cement\, fertilisers — due in 1 da
 y
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:dac8-crypto-first-report@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:DAC8: first annual crypto-asset transaction report to tax authoriti
 es (covering 2026)
DESCRIPTION:Since 1 January 2026 crypto-asset service providers (exchanges\
 , brokers\, custodial wallet providers\, some DeFi front-ends) must collec
 t and verify customer identity and tax residence and record all exchange a
 nd transfer transactions of EU users. The first annual report to the tax a
 uthority is due in 2027\, and data is exchanged between Member States. DAC
 7 already imposes similar annual reporting (by 31 January) on digital plat
 forms for sellers.\n\nWho is affected: Any business that provides crypto e
 xchange\, transfer or custody services to EU customers\, including MiCA-au
 thorised firms and non-EU providers serving EU users.\n\nWhat to do: Regis
 ter as a reporting crypto-asset service provider in one Member State if no
 t MiCA-authorised. Collect self-certifications (name\, address\, TIN\, tax
  residence) from all users\, keep transaction records from 1 January 2026\
 , and set up XML reporting in the national format before the first deadlin
 e.\n\nPenalty: Set nationally\; typically fines per unreported user/transa
 ction\n\nNote: Reporting obligation applies from 2026-01-01\; the Commissi
 on states the first report is due within nine months after the end of 2026
  – national laws may set an earlier date (e.g. 31 January)\, check your 
 Member State\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/dac8-cr
 ypto-first-report
URL:https://eudeadlines.eu/deadline/dac8-crypto-first-report
CATEGORIES:EU,DAC8
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:DAC8: first annual crypto-asset transaction report to tax autho
 rities (covering 2026) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:DAC8: first annual crypto-asset transaction report to tax autho
 rities (covering 2026) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:ai-act-high-risk-annex-iii@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20271202
DTEND;VALUE=DATE:20271203
SUMMARY:AI Act: high-risk AI obligations for Annex III use cases (HR\, cred
 it\, education\, biometrics\, critical infrastructure)
DESCRIPTION:AI used for recruiting and managing workers\, credit scoring\, 
 insurance pricing\, education admissions\, biometric identification\, crit
 ical infrastructure and law enforcement becomes 'high-risk'. Providers nee
 d a risk-management system\, data governance\, technical documentation\, l
 ogging\, human oversight and a conformity assessment\; deployers must use 
 the systems as instructed\, keep logs and inform affected people.\n\nWho i
 s affected: Companies building such AI systems\, and any employer or lende
 r that uses them (deployer duties)\, regardless of size. SMEs get simplifi
 ed documentation templates.\n\nWhat to do: Map every AI system you build o
 r use against Annex III. For in-scope systems\, start a compliance file no
 w: intended purpose\, risk assessment\, training-data description\, human-
 oversight design\, accuracy and cybersecurity testing. Deployers: get prov
 ider documentation\, appoint a human overseer\, and prepare worker informa
 tion notices. Register systems in the EU database before use.\n\nPenalty: 
 Up to €15M or 3% of worldwide turnover (SMEs: lower of the two)\n\nNote:
  Postponed from 2026-08-02 by the Digital Omnibus on AI\, Regulation (EU) 
 2026/1744 (OJ 2026-07-24\, in force 2026-07-27)\n\nStatus: Delayed\nhttps:
 //eudeadlines.eu/deadline/ai-act-high-risk-annex-iii
URL:https://eudeadlines.eu/deadline/ai-act-high-risk-annex-iii
CATEGORIES:EU,EU AI Act
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: high-risk AI obligations for Annex III use cases (HR\, 
 credit\, education\, biometrics\, critical infrastructure) — due in 7 da
 ys
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: high-risk AI obligations for Annex III use cases (HR\, 
 credit\, education\, biometrics\, critical infrastructure) — due in 1 da
 y
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:cra-full-application@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20271211
DTEND;VALUE=DATE:20271212
SUMMARY:Cyber Resilience Act: CRA: full application – secure-by-design re
 quirements\, conformity assessment and CE marking for software and connect
 ed products
DESCRIPTION:From this date every product with digital elements placed on th
 e EU market must meet the essential cybersecurity requirements (secure def
 aults\, no known exploitable vulnerabilities\, security updates for the su
 pport period\, SBOM)\, pass a conformity assessment and carry CE marking. 
 Importers and distributors must check compliance.\n\nWho is affected: Manu
 facturers\, importers and distributors that place a 'product with digital 
 elements' on the EU market as a distinct product — connected hardware\, 
 distributable/installable software\, firmware\, and client apps a manufact
 urer ships with a device — including IoT makers and app developers. A pu
 re browser-delivered SaaS with no distributed installable product is gener
 ally OUT of CRA scope per Recitals 11-12 (standalone remote data-processin
 g solutions are excluded)\; the flags below can only approximate this dist
 inction\, so read this note rather than relying on the tags alone if you s
 ell software purely as a hosted service.\n\nWhat to do: Classify each prod
 uct (default\, important class I/II\, or critical) to know whether self-as
 sessment is enough. Implement a secure development lifecycle\, vulnerabili
 ty handling and update policy\, and generate an SBOM. Prepare technical do
 cumentation\, the EU declaration of conformity and user security informati
 on. Define the product's support period (at least 5 years by default).\n\n
 Penalty: Up to €15M or 2.5% of worldwide turnover\n\n\nStatus: Confirmed
 \nhttps://eudeadlines.eu/deadline/cra-full-application
URL:https://eudeadlines.eu/deadline/cra-full-application
CATEGORIES:EU,Cyber Resilience Act
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Cyber Resilience Act: CRA: full application – secure-by-desig
 n requirements\, conformity assessment and CE marking for software and con
 nected products — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Cyber Resilience Act: CRA: full application – secure-by-desig
 n requirements\, conformity assessment and CE marking for software and con
 nected products — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eu-forced-labour-regulation-applies@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20271214
DTEND;VALUE=DATE:20271215
SUMMARY:Forced Labour Regulation: ban on placing\, selling or exporting pro
 ducts made with forced labour
DESCRIPTION:Regulation (EU) 2024/3015 bans placing products made with force
 d labour on the EU market\, making them available\, or exporting them\, an
 ywhere along the supply chain. National authorities and the Commission can
  investigate suspected products and order withdrawal\, donation\, recyclin
 g or destruction. There is no company-size exemption — only extra guidan
 ce and a dedicated SME contact point.\n\nWho is affected: Any business tha
 t places products on the EU market or exports from it — manufacturers\, 
 importers and distributors of any size — with the highest practical expo
 sure for importers sourcing from regions or sectors with documented forced
 -labour risk.\n\nWhat to do: Map your supply chain for forced-labour risk\
 , especially raw materials and first-tier suppliers in higher-risk regions
  or sectors. Set up a due-diligence and complaints process so you can resp
 ond to a Commission or customs information request. Keep supplier audits\,
  certifications and contracts on file\, and watch for the Commission's ris
 k-indicators database and SME guidance.\n\nPenalty: Withdrawal\, and destr
 uction\, recycling or donation of non-compliant products\, plus denial of 
 market access\; no EU-wide turnover-based fine is set\, but Member States 
 must set effective\, proportionate and dissuasive penalties.\n\n\nStatus: 
 Confirmed\nhttps://eudeadlines.eu/deadline/eu-forced-labour-regulation-app
 lies
URL:https://eudeadlines.eu/deadline/eu-forced-labour-regulation-applies
CATEGORIES:EU,Forced Labour Regulation
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Forced Labour Regulation: ban on placing\, selling or exporting
  products made with forced labour — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Forced Labour Regulation: ban on placing\, selling or exporting
  products made with forced labour — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eudi-wallet-private-acceptance@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20271224
DTEND;VALUE=DATE:20271225
SUMMARY:eIDAS 2: EU Digital Identity Wallet: regulated private services mus
 t accept the wallet for strong customer identification
DESCRIPTION:Private companies that are legally required to identify custome
 rs with strong authentication – banks\, payment and crypto firms\, telec
 oms\, energy and utilities\, insurers\, healthcare providers\, transport a
 nd very large online platforms – must accept the EU Digital Identity Wal
 let when a user offers it\, in addition to their existing methods.\n\nWho 
 is affected: Regulated service providers in finance\, telecom\, energy\, h
 ealth\, transport and large platforms\, of any size.\n\nWhat to do: Add wa
 llet-based login and KYC to your onboarding and strong-authentication flow
 s using the EU reference standards\, and register as a relying party in yo
 ur Member State's register. Test with your national wallet pilots during 2
 027.\n\nPenalty: Supervisory measures under national eIDAS enforcement\n\n
 Note: 36 months after the implementing regulations (Art. 5f Reg. 2024/1183
 )\; exact national enforcement dates may vary\n\nStatus: Confirmed\nhttps:
 //eudeadlines.eu/deadline/eudi-wallet-private-acceptance
URL:https://eudeadlines.eu/deadline/eudi-wallet-private-acceptance
CATEGORIES:EU,eIDAS 2
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:eIDAS 2: EU Digital Identity Wallet: regulated private services
  must accept the wallet for strong customer identification — due in 7 da
 ys
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:eIDAS 2: EU Digital Identity Wallet: regulated private services
  must accept the wallet for strong customer identification — due in 1 da
 y
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:espr-first-delegated-acts-dpp@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:[indicative date] Ecodesign (ESPR): ESPR: first product-specific ec
 odesign and Digital Product Passport rules (iron & steel\, textiles\, tyre
 s\, aluminium)
DESCRIPTION:The Ecodesign for Sustainable Products Regulation (EU) 2024/178
 1 lets the Commission set durability\, repairability\, recycled-content an
 d information requirements product group by product group\, each with a Di
 gital Product Passport. The first acts (steel\, then textiles\, tyres\, al
 uminium\, furniture) are expected in 2026-2028 and will apply after a tran
 sition period. Since 19 July 2026 large companies may also no longer destr
 oy unsold clothing and footwear.\n\nWho is affected: Manufacturers\, impor
 ters and brands of the first product groups\, especially clothing\, footwe
 ar\, steel products\, tyres and furniture\; retailers will need to display
  DPP information.\n\nWhat to do: Follow the ESPR working plan for your pro
 duct group. Start collecting product-level data (materials\, origin\, recy
 cled content\, repair info) in a structured way so it can feed a DPP. Set 
 up an unsold-goods policy and tracking – large companies must already di
 sclose discarded unsold products.\n\n\nNote: Indicative. Per the Commissio
 n's ESPR working plan 2025-2030 delegated acts are targeted for iron & ste
 el in 2026 and textiles\, tyres and aluminium in 2027\; obligations typica
 lly apply ~18 months after adoption. As of August 2026 no delegated act ha
 s been adopted\n\nStatus: Proposed\nhttps://eudeadlines.eu/deadline/espr-f
 irst-delegated-acts-dpp
URL:https://eudeadlines.eu/deadline/espr-first-delegated-acts-dpp
CATEGORIES:EU,Ecodesign (ESPR)
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Ecodesign (ESPR): ESPR: first product-specific ecodesign and Di
 gital Product Passport rules (iron & steel\, textiles\, tyres\, aluminium)
  — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Ecodesign (ESPR): ESPR: first product-specific ecodesign and Di
 gital Product Passport rules (iron & steel\, textiles\, tyres\, aluminium)
  — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:late-payment-regulation-proposal@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:[indicative date] Late Payment Regulation: Proposed EU Late Payment
  Regulation: 30-day maximum payment terms in B2B transactions
DESCRIPTION:The Commission proposed replacing the Late Payment Directive wi
 th a regulation capping B2B and B2G payment terms at 30 days\, making late
 -payment interest automatic and creating national enforcement authorities.
  The file has not progressed in the Council since 2024\, so no date is fix
 ed.\n\nWho is affected: All businesses\, especially SMEs supplying larger 
 customers on long payment terms.\n\nWhat to do: No action required yet. Wa
 tch the file\; if adopted\, contracts with payment terms above 30 days wou
 ld need to be renegotiated and invoicing/dunning systems updated to charge
  statutory interest automatically.\n\n\nNote: Placeholder – no applicati
 on date exists. Commission proposal COM(2023) 533 remains open: Parliament
  adopted its position in April 2024\, but the file is classified 'Blocked'
  by the European Parliament's Legislative Train Schedule (no Council progr
 ess for 9+ months\, as of Aug 2026) and 'Ongoing' by the EUR-Lex procedure
  tracker — not withdrawn\, despite some secondary sources claiming so. E
 xisting Directive 2011/7/EU (60-day default) continues to apply.\n\nStatus
 : Proposed\nhttps://eudeadlines.eu/deadline/late-payment-regulation-propos
 al
URL:https://eudeadlines.eu/deadline/late-payment-regulation-proposal
CATEGORIES:EU,Late Payment Regulation
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Late Payment Regulation: Proposed EU Late Payment Regulation: 3
 0-day maximum payment terms in B2B transactions — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Late Payment Regulation: Proposed EU Late Payment Regulation: 3
 0-day maximum payment terms in B2B transactions — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:vida-platform-economy-single-registration@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20280701
DTEND;VALUE=DATE:20280702
SUMMARY:ViDA: platform deemed-supplier rules for short-term rentals and pas
 senger transport\; single VAT registration
DESCRIPTION:Platforms facilitating short-term accommodation rentals (up to 
 30 nights) and passenger transport become the deemed VAT supplier when the
  underlying host or driver does not charge VAT. The One-Stop-Shop is exten
 ded (own-goods transfers\, B2C supplies) and a mandatory reverse charge fo
 r non-established suppliers reduces the need for foreign VAT registrations
 .\n\nWho is affected: Marketplaces and booking platforms in accommodation 
 and transport\; SMEs selling cross-border in the EU that currently hold se
 veral VAT registrations.\n\nWhat to do: Platforms: build VAT collection an
 d remittance for deemed-supplier transactions and collect host/driver VAT 
 status. Cross-border sellers: review whether the extended OSS lets you clo
 se foreign VAT registrations from July 2028 and update ERP tax settings.\n
 \n\nNote: Council Directive (EU) 2025/516\; Member States may postpone the
  platform deemed-supplier rules until 2030-01-01\n\nStatus: Confirmed\nhtt
 ps://eudeadlines.eu/deadline/vida-platform-economy-single-registration
URL:https://eudeadlines.eu/deadline/vida-platform-economy-single-registrati
 on
CATEGORIES:EU,ViDA
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ViDA: platform deemed-supplier rules for short-term rentals and
  passenger transport\; single VAT registration — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ViDA: platform deemed-supplier rules for short-term rentals and
  passenger transport\; single VAT registration — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:ai-act-high-risk-annex-i-products@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20280802
DTEND;VALUE=DATE:20280803
SUMMARY:AI Act: high-risk rules for AI embedded in regulated products (mach
 inery\, medical devices\, toys\, lifts)
DESCRIPTION:AI that is a safety component of products covered by EU product
  legislation listed in Annex I (machinery\, medical devices\, toys\, lifts
 \, vehicles\, etc.) must meet the AI Act's high-risk requirements as part 
 of the product's CE conformity assessment.\n\nWho is affected: Manufacture
 rs and importers of physical products with AI safety functions\, and their
  software suppliers.\n\nWhat to do: Identify products where AI performs a 
 safety function. Plan to integrate AI Act requirements (risk management\, 
 data governance\, logging\, human oversight) into the product's existing c
 onformity assessment and technical file. Align with notified bodies early 
 because assessments will be combined.\n\nPenalty: Up to €15M or 3% of wo
 rldwide turnover (SMEs: lower of the two)\n\nNote: Postponed from 2027-08-
 02 by the Digital Omnibus on AI (Reg. 2026/1744)\n\nStatus: Delayed\nhttps
 ://eudeadlines.eu/deadline/ai-act-high-risk-annex-i-products
URL:https://eudeadlines.eu/deadline/ai-act-high-risk-annex-i-products
CATEGORIES:EU,EU AI Act
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: high-risk rules for AI embedded in regulated products (
 machinery\, medical devices\, toys\, lifts) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: high-risk rules for AI embedded in regulated products (
 machinery\, medical devices\, toys\, lifts) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:ppwr-recycled-content-single-use-bans@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20300101
DTEND;VALUE=DATE:20300102
SUMMARY:PPWR: minimum recycled content in plastic packaging and bans on cer
 tain single-use formats
DESCRIPTION:Plastic packaging must contain minimum shares of post-consumer 
 recycled plastic (10-35% depending on type)\, all packaging must be recycl
 able by design\, and listed single-use formats (e.g. small hotel toiletrie
 s\, plastic packaging for unprocessed fruit and vegetables under 1.5 kg\, 
 single-portion condiment sachets in HoReCa) are prohibited.\n\nWho is affe
 cted: Producers and importers of plastic-packaged goods\, hospitality busi
 nesses\, food retailers and e-commerce sellers.\n\nWhat to do: Ask packagi
 ng suppliers for recycled-content certificates and recyclability grades no
 w\; redesign or switch formats that will be banned. Build packaging data (
 weight\, material\, recycled share) into your product master data for futu
 re reporting.\n\n\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/pp
 wr-recycled-content-single-use-bans
URL:https://eudeadlines.eu/deadline/ppwr-recycled-content-single-use-bans
CATEGORIES:EU,PPWR
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:PPWR: minimum recycled content in plastic packaging and bans on
  certain single-use formats — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:PPWR: minimum recycled content in plastic packaging and bans on
  certain single-use formats — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eaa-services-transition-ends@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20300628
DTEND;VALUE=DATE:20300629
SUMMARY:EAA: European Accessibility Act: end of transition for legacy servi
 ce contracts and self-service terminals
DESCRIPTION:Service contracts concluded before 28 June 2025 may run unchang
 ed until 28 June 2030\, and products lawfully used to deliver a service be
 fore that date (e.g. payment or ticketing terminals) may keep being used u
 ntil then\, or up to 20 years for self-service terminals. After this date 
 everything in use must be accessible.\n\nWho is affected: Small\, medium a
 nd large service providers still relying on pre-2025 contracts or legacy t
 erminals\; microenterprise service providers remain exempt.\n\nWhat to do:
  List service contracts and terminals that predate June 2025. Plan replace
 ments or upgrades so all customer-facing services and equipment are access
 ible by mid-2030. Include accessibility clauses in every renewal.\n\n\n\nS
 tatus: Confirmed\nhttps://eudeadlines.eu/deadline/eaa-services-transition-
 ends
URL:https://eudeadlines.eu/deadline/eaa-services-transition-ends
CATEGORIES:EU,EAA
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EAA: European Accessibility Act: end of transition for legacy s
 ervice contracts and self-service terminals — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EAA: European Accessibility Act: end of transition for legacy s
 ervice contracts and self-service terminals — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:vida-digital-reporting-intra-eu@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20300701
DTEND;VALUE=DATE:20300702
SUMMARY:ViDA: mandatory e-invoicing and near-real-time digital reporting fo
 r intra-EU B2B transactions
DESCRIPTION:Structured e-invoices (EN 16931) become the default for cross-b
 order B2B supplies within the EU\, issued within 10 days of the chargeable
  event\, and the invoice data must be reported to the tax authority almost
  in real time. Recapitulative statements (EC Sales Lists) are abolished.\n
 \nWho is affected: Every VAT-registered business that sells goods or servi
 ces to businesses in other EU countries\, whatever its size.\n\nWhat to do
 : Choose invoicing software that can issue and receive EN 16931 e-invoices
  (Peppol is the safest bet) well before 2030. Clean master data (VAT numbe
 rs\, addresses) and make sure invoices can be issued within 10 days. Align
  with any earlier national mandate (e.g. Latvia 2028\, Germany 2027/2028\,
  Poland 2026).\n\n\n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/v
 ida-digital-reporting-intra-eu
URL:https://eudeadlines.eu/deadline/vida-digital-reporting-intra-eu
CATEGORIES:EU,ViDA
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ViDA: mandatory e-invoicing and near-real-time digital reportin
 g for intra-EU B2B transactions — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ViDA: mandatory e-invoicing and near-real-time digital reportin
 g for intra-EU B2B transactions — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:toy-safety-regulation-applies@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20300801
DTEND;VALUE=DATE:20300802
SUMMARY:Toy Safety Regulation: New Toy Safety Regulation applies: digital p
 roduct passport replaces the declaration of conformity\, stricter chemical
  rules
DESCRIPTION:Every toy placed on the EU market will need a digital product p
 assport accessible via a data carrier on the toy or packaging\, carrying c
 ompliance information. Bans on endocrine disruptors\, PFAS and most allerg
 enic fragrances are extended\, connected toys get cybersecurity and privac
 y requirements\, and online marketplaces must check DPP data before listin
 g.\n\nWho is affected: Toy manufacturers\, importers\, distributors and on
 line sellers/marketplaces\, of any size.\n\nWhat to do: Start chemical ref
 ormulation and testing against the new substance limits. Plan DPP creation
  for each toy model (data carrier on product\, structured compliance data)
  and align with your ESPR/DPP tooling. Marketplaces: prepare to verify DPP
  presence for toy listings.\n\nPenalty: Set nationally\; non-compliant toy
 s withdrawn from the market\n\nNote: Regulation (EU) 2025/2509 published O
 J 2025-12-12\, in force 2026-01-01\, applies after a 4.5-year transition\;
  toys placed on the market before that date may continue to be sold\n\nSta
 tus: Confirmed\nhttps://eudeadlines.eu/deadline/toy-safety-regulation-appl
 ies
URL:https://eudeadlines.eu/deadline/toy-safety-regulation-applies
CATEGORIES:EU,Toy Safety Regulation
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Toy Safety Regulation: New Toy Safety Regulation applies: digit
 al product passport replaces the declaration of conformity\, stricter chem
 ical rules — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Toy Safety Regulation: New Toy Safety Regulation applies: digit
 al product passport replaces the declaration of conformity\, stricter chem
 ical rules — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:vida-national-systems-harmonised@eudeadlines.eu
DTSTAMP:20260909T020551Z
DTSTART;VALUE=DATE:20350101
DTEND;VALUE=DATE:20350102
SUMMARY:ViDA: national e-invoicing/reporting systems must be interoperable 
 with the EU standard
DESCRIPTION:Countries that introduced domestic real-time reporting or e-inv
 oicing systems before 2024 (e.g. Italy\, Poland\, France\, Hungary) must a
 lign them with the EU digital reporting model by 2035\, so businesses can 
 use one format across the EU.\n\nWho is affected: Businesses operating in 
 several EU countries with different national e-invoicing regimes.\n\nWhat 
 to do: Prefer invoicing tools built on the EU standard (EN 16931/Peppol) r
 ather than country-specific formats\, so migration in 2035 is trivial.\n\n
 \n\nStatus: Confirmed\nhttps://eudeadlines.eu/deadline/vida-national-syste
 ms-harmonised
URL:https://eudeadlines.eu/deadline/vida-national-systems-harmonised
CATEGORIES:EU,ViDA
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ViDA: national e-invoicing/reporting systems must be interopera
 ble with the EU standard — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:ViDA: national e-invoicing/reporting systems must be interopera
 ble with the EU standard — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
END:VCALENDAR
