BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//EU Deadline Radar//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:EU Deadline Radar (Latvia\, 2027)
NAME:EU Deadline Radar (Latvia\, 2027)
X-WR-CALDESC:Compliance deadlines Latvia in 2027. https://eudeadlines.eu/de
 /calendar/lv/2027
BEGIN:VEVENT
UID:lv-epr-eee-battery-interim-report@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270831
DTEND;VALUE=DATE:20270901
SUMMARY:Latvia extended producer responsibility (EPR) — EEE & batteries: 
 Latvia: electrical/electronic equipment & battery producer — interim EPR
  report due 31 August
RRULE:FREQ=YEARLY;BYMONTH=8;BYMONTHDAY=-1
DESCRIPTION:Producers registered under Latvia's extended producer responsib
 ility (EPR) system for electrical/electronic equipment and batteries must 
 also submit an interim report to the State Environmental Service (VVD) cov
 ering the first half of the calendar year (1 January-30 June)\, by 31 Augu
 st.\n\nWer betroffen ist: Latvia companies that place electrical/electroni
 c equipment or batteries on the market and are registered producers under 
 the EPR system\, e.g. consumer-electronics importers and retailers.\n\nWas
  zu tun ist: Compile your first-half-year (1 Jan-30 Jun) EEE/battery place
 d-on-market data and submit the interim report to VVD (electronically\, pa
 sts@vvd.gov.lv) by 31 August.\n\n\nHinweis zum Datum: First occurrence in 
 the recurrence sequence\; the 2026 occurrence has already passed as of thi
 s entry's lastVerified date\, so the next live occurrence is 2027-08-31.\n
 \nStatus: Bestätigt\nhttps://eudeadlines.eu/de/deadline/lv-epr-eee-batter
 y-interim-report
URL:https://eudeadlines.eu/de/deadline/lv-epr-eee-battery-interim-report
CATEGORIES:LV,Latvia extended producer responsibility (EPR) — EEE & batte
 ries
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia extended producer responsibility (EPR) — EEE & batteri
 es: Latvia: electrical/electronic equipment & battery producer — interim
  EPR report due 31 August — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia extended producer responsibility (EPR) — EEE & batteri
 es: Latvia: electrical/electronic equipment & battery producer — interim
  EPR report due 31 August — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-employer-report-monthly@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20260917
DTEND;VALUE=DATE:20260918
SUMMARY:Latvia VSAOI/IIN employer's report: Latvia: employer's monthly repo
 rt (darba devēja ziņojums) due by the 17th
RRULE:FREQ=MONTHLY;BYMONTHDAY=17
DESCRIPTION:Employers with staff must submit a monthly "darba devēja ziņo
 jums" to VID\, reporting each employee's mandatory state social insurance 
 (VSAOI) contribution base and the personal income tax (IIN) withheld for t
 he previous reporting month.\n\nWer betroffen ist: Every Latvia-registered
  employer\, including a one-person SIA where the board member is on payrol
 l\, that paid at least one person reportable employment income in the repo
 rting month.\n\nWas zu tun ist: Submit the darba devēja ziņojums via VID
  EDS by the 17th of the month following the reporting month\, listing each
  employee's income and contribution base. Reconcile it with payroll record
 s ahead of the separate 23rd-of-month VSAOI/IIN payment deadline.\n\nSankt
 ion: Administrative fine for late or non-submission of the report under th
 e Law On Taxes and Duties\; an inaccurate or late report that understates 
 the tax due can also trigger a nokavējuma nauda of 0.05% per day on the s
 hortfall.\n\n\nStatus: Bestätigt\nhttps://eudeadlines.eu/de/deadline/lv-e
 mployer-report-monthly
URL:https://eudeadlines.eu/de/deadline/lv-employer-report-monthly
CATEGORIES:LV,Latvia VSAOI/IIN employer's report
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia VSAOI/IIN employer's report: Latvia: employer's monthly 
 report (darba devēja ziņojums) due by the 17th — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia VSAOI/IIN employer's report: Latvia: employer's monthly 
 report (darba devēja ziņojums) due by the 17th — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-cit-distributed-profit-monthly@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20260920
DTEND;VALUE=DATE:20260921
SUMMARY:Latvia UIN (corporate income tax): Latvia: monthly corporate income
  tax (UIN) declaration due by the 20th when profit is distributed
RRULE:FREQ=MONTHLY;BYMONTHDAY=20
DESCRIPTION:Latvia's corporate income tax is charged only when profit is di
 stributed (e.g. dividends) or spent on non-business or other UIN-taxable i
 tems\, not on an annual accrual basis\, and the taxation period is the cal
 endar month. In any month such a taxable event occurs\, the company must f
 ile a UIN declaration and pay the tax by the 20th of the following month\;
  months with no taxable event require no filing.\n\nWer betroffen ist: Any
  Latvia-registered company under the general CIT regime (SIA\, AS) that di
 stributes dividends\, covers non-business expenses\, or has another UIN-ta
 xable event in a given calendar month. Companies that fully reinvest profi
 t and have no such events have no monthly filing obligation.\n\nWas zu tun
  ist: Track dividend decisions and other UIN-taxable transactions with you
 r accountant every month. When a taxable event occurred\, file the UIN dec
 laration via VID EDS and pay the tax by the 20th of the following month\; 
 when none occurred\, no declaration is due for that month.\n\nSanktion: La
 te-payment penalty (nokavējuma nauda) of 0.05% of the outstanding amount 
 per day under Section 29 of the Law On Taxes and Duties\, plus possible fi
 nes for non-submission when a declaration was in fact due.\n\n\nStatus: Be
 stätigt\nhttps://eudeadlines.eu/de/deadline/lv-cit-distributed-profit-mon
 thly
URL:https://eudeadlines.eu/de/deadline/lv-cit-distributed-profit-monthly
CATEGORIES:LV,Latvia UIN (corporate income tax)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia UIN (corporate income tax): Latvia: monthly corporate in
 come tax (UIN) declaration due by the 20th when profit is distributed — 
 due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia UIN (corporate income tax): Latvia: monthly corporate in
 come tax (UIN) declaration due by the 20th when profit is distributed — 
 due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-eu-supplies-report-monthly@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20260920
DTEND;VALUE=DATE:20260921
SUMMARY:Latvia PVN – EU supplies recapitulative statement: Latvia: report
  on supplies of goods and services within the EU due by the 20th
RRULE:FREQ=MONTHLY;BYMONTHDAY=20
DESCRIPTION:VAT-registered businesses in Latvia that supply goods\, or cert
 ain services under the general B2B place-of-supply rule\, to VAT-registere
 d customers in other EU member states must additionally submit a 'Pārskat
 s par preču piegādēm un pakalpojumiem Eiropas Savienības teritorijā' 
 (report on supplies of goods and services within the EU territory) to VID\
 , alongside the regular PVN return. It lists each EU customer's VAT number
  and the value of supplies made to them in the period\, and is one of the 
 checks used to verify zero-rated intra-EU supplies.\n\nWer betroffen ist: 
 VAT-registered Latvian businesses that sell goods\, or supply general-rule
  B2B services\, to VAT-registered customers in other EU member states.\n\n
 Was zu tun ist: File the EU supplies report together with your regular PVN
  return via EDS. Make sure the value reported matches your PVN return's ze
 ro-rated intra-EU supply lines\, and validate every listed customer's VAT 
 number via VIES before filing.\n\nSanktion: Administrative fine for failin
 g to file or for material inaccuracies\; can trigger a VID audit of the un
 derlying zero-rated supplies\n\nHinweis zum Datum: The Pievienotās vērt
 ības nodokļa likums references this report (Art. 8.1(1)4\, Art. 16(4)) a
 s distinct from the regular PVN return\, but this session could not fetch 
 the specific procedural article confirming its exact filing day\; this ent
 ry assumes it follows the same taxation-period deadline as the regular PVN
  return (20th of the month for monthly filers\, matching lv-vat-return-mon
 thly) pending a dedicated re-check.\n\nStatus: Bestätigt\nhttps://eudeadl
 ines.eu/de/deadline/lv-eu-supplies-report-monthly
URL:https://eudeadlines.eu/de/deadline/lv-eu-supplies-report-monthly
CATEGORIES:LV,Latvia PVN – EU supplies recapitulative statement
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia PVN – EU supplies recapitulative statement: Latvia: re
 port on supplies of goods and services within the EU due by the 20th — d
 ue in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia PVN – EU supplies recapitulative statement: Latvia: re
 port on supplies of goods and services within the EU due by the 20th — d
 ue in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-vat-return-monthly@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20260920
DTEND;VALUE=DATE:20260921
SUMMARY:Latvia PVN (VAT) return: Latvia: VAT (PVN) return and payment due b
 y the 20th
RRULE:FREQ=MONTHLY;BYMONTHDAY=20
DESCRIPTION:VAT-registered businesses in Latvia must submit their PVN decla
 ration to VID through EDS and pay any VAT due within 20 days after the end
  of the taxation period. For most active VAT payers the taxation period is
  one calendar month\, so the return and payment fall due by the 20th of th
 e following month.\n\nWer betroffen ist: Any Latvia-registered VAT payer w
 hose taxable turnover exceeded €50\,000 in the current or preceding year
 \, who trades goods/services cross-border within the EU\, belongs to a VAT
  group\, acts as a fiscal representative\, or is in the first 6 calendar m
 onths after VAT registration — in practice most actively trading VAT-reg
 istered companies.\n\nWas zu tun ist: File the PVN declaration via VID EDS
  and pay any VAT due into the single tax account (vienotais nodokļu konts
 ) by the 20th of the month following the taxation period. Re-check your ta
 xation period (month/quarter/half-year) at the start of each year\, since 
 crossing the €50\,000 turnover threshold or starting EU cross-border tra
 de switches you to monthly filing.\n\nSanktion: Late-payment penalty (noka
 vējuma nauda) of 0.05% of the outstanding amount per day under Section 29
  of the Law On Taxes and Duties (likums "Par nodokļiem un nodevām")\, pl
 us possible fines for late or non-submission of the declaration.\n\n\nStat
 us: Bestätigt\nhttps://eudeadlines.eu/de/deadline/lv-vat-return-monthly
URL:https://eudeadlines.eu/de/deadline/lv-vat-return-monthly
CATEGORIES:LV,Latvia PVN (VAT) return
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia PVN (VAT) return: Latvia: VAT (PVN) return and payment d
 ue by the 20th — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia PVN (VAT) return: Latvia: VAT (PVN) return and payment d
 ue by the 20th — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-vsaoi-iin-payment-monthly@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20260923
DTEND;VALUE=DATE:20260924
SUMMARY:Latvia VSAOI/IIN payment: Latvia: mandatory social insurance (VSAOI
 ) and payroll income tax (IIN) payment due by the 23rd
RRULE:FREQ=MONTHLY;BYMONTHDAY=23
DESCRIPTION:Employers must pay both the employee's and the employer's share
  of state mandatory social insurance contributions (VSAOI)\, together with
  the personal income tax (IIN) withheld from staff\, into the single tax a
 ccount by the 23rd of the month following the reporting month.\n\nWer betr
 offen ist: Every Latvia-registered employer with staff or a board member o
 n payroll for the reporting month.\n\nWas zu tun ist: Using the figures al
 ready filed in the darba devēja ziņojums\, pay the combined VSAOI (emplo
 yer + employee shares) and withheld IIN into the vienotais nodokļu konts 
 (single tax account) by the 23rd of the month following the reporting mont
 h\, using the current rates published by VID.\n\nSanktion: Late-payment pe
 nalty (nokavējuma nauda) of 0.05% of the outstanding amount per day under
  Section 29 of the Law On Taxes and Duties.\n\n\nStatus: Bestätigt\nhttps
 ://eudeadlines.eu/de/deadline/lv-vsaoi-iin-payment-monthly
URL:https://eudeadlines.eu/de/deadline/lv-vsaoi-iin-payment-monthly
CATEGORIES:LV,Latvia VSAOI/IIN payment
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia VSAOI/IIN payment: Latvia: mandatory social insurance (V
 SAOI) and payroll income tax (IIN) payment due by the 23rd — due in 7 da
 ys
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia VSAOI/IIN payment: Latvia: mandatory social insurance (V
 SAOI) and payroll income tax (IIN) payment due by the 23rd — due in 1 da
 y
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-mun-quarterly-declaration@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20261015
DTEND;VALUE=DATE:20261016
SUMMARY:Latvia micro-enterprise tax (MUN): Latvia: micro-enterprise tax (MU
 N) quarterly declaration due by the 15th
RRULE:FREQ=MONTHLY;INTERVAL=3;BYMONTHDAY=15
DESCRIPTION:Companies registered under Latvia's micro-enterprise tax (mikro
 uzņēmumu nodoklis\, MUN) regime must file a quarterly declaration with V
 ID reporting turnover for each month of the quarter and the resulting tax.
 \n\nWer betroffen ist: Latvia individual merchants (individuālie komersan
 ti)\, individual enterprises\, farm/fishing enterprises and other natural 
 persons registered with VID as performing business activity (Mikrouzņēmu
 mu nodokļa likums\, 1. panta 3. punkts)\, who have opted into the MUN reg
 ime and remain within its turnover and other eligibility limits. SIAs (lim
 ited liability companies) can NOT hold micro-enterprise taxpayer status 
 — that route closed for good on 2022-01-01 (Pārejas noteikumu 36. punkt
 s) — so this entry is never relevant to an SIA\, only to sole-trader-typ
 e registrations.\n\nWas zu tun ist: File the quarterly MUN declaration via
  VID EDS by the 15th of the month after the quarter ends\, then pay the ca
 lculated micro-enterprise tax into the single tax account by the 23rd of t
 he same month.\n\nSanktion: Late-payment penalty (nokavējuma nauda) of 0.
 05% of the outstanding amount per day under Section 29 of the Law On Taxes
  and Duties.\n\nHinweis zum Datum: Corrected 2026-09-08: SIAs (limited lia
 bility companies) cannot hold micro-enterprise taxpayer status. Since MUN 
 eligibility narrowed with effect from 2021\, only individually-registered 
 taxpayers qualify (Mikrouzņēmumu nodokļa likums\, 1. panta 3. punkts)\;
  a transitional exception let SIAs that already had MUN status keep it thr
 ough 2021\, but Pārejas noteikumu 36. punkts ended even that on 2022-01-0
 1. This entry previously stated SIAs were included — that was wrong.\n\n
 Status: Bestätigt\nhttps://eudeadlines.eu/de/deadline/lv-mun-quarterly-de
 claration
URL:https://eudeadlines.eu/de/deadline/lv-mun-quarterly-declaration
CATEGORIES:LV,Latvia micro-enterprise tax (MUN)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia micro-enterprise tax (MUN): Latvia: micro-enterprise tax
  (MUN) quarterly declaration due by the 15th — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia micro-enterprise tax (MUN): Latvia: micro-enterprise tax
  (MUN) quarterly declaration due by the 15th — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-self-employed-vsaoi-quarterly@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20261017
DTEND;VALUE=DATE:20261018
SUMMARY:Latvia self-employed VSAOI/IIN: Latvia: self-employed person's quar
 terly VSAOI/IIN report due by the 17th
RRULE:FREQ=MONTHLY;INTERVAL=3;BYMONTHDAY=17
DESCRIPTION:A self-employed person (pašnodarbinātais) registered with VID
  as performing saimnieciskā darbība must file a quarterly report of thei
 r own mandatory state social insurance (VSAOI) contribution base and perso
 nal income tax (IIN)\, then pay the resulting contributions into the singl
 e tax account. This is separate from the employer-side monthly reports tha
 t only apply when the person has employees.\n\nWer betroffen ist: Latvia-r
 egistered self-employed individuals (sole traders\, and other persons regi
 stered as veicot saimniecisko darbību\, e.g. an outsourced accountant wor
 king for themselves) who pay their own VSAOI/IIN rather than having an emp
 loyer withhold it.\n\nWas zu tun ist: File the quarterly VSAOI/IIN report 
 via VID EDS by the 17th of the month after the quarter ends\, then pay the
  calculated contributions into the single tax account by the 23rd of the s
 ame month. A report is not required for a quarter with no income\, but the
  separate annual income declaration is still mandatory regardless of incom
 e.\n\nSanktion: Late-payment penalty (nokavējuma nauda) of 0.05% of the o
 utstanding amount per day under Section 29 of the Law On Taxes and Duties\
 , as for other VID-administered taxes.\n\n\nStatus: Bestätigt\nhttps://eu
 deadlines.eu/de/deadline/lv-self-employed-vsaoi-quarterly
URL:https://eudeadlines.eu/de/deadline/lv-self-employed-vsaoi-quarterly
CATEGORIES:LV,Latvia self-employed VSAOI/IIN
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia self-employed VSAOI/IIN: Latvia: self-employed person's 
 quarterly VSAOI/IIN report due by the 17th — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia self-employed VSAOI/IIN: Latvia: self-employed person's 
 quarterly VSAOI/IIN report due by the 17th — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-drn-quarterly-declaration@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20261020
DTEND;VALUE=DATE:20261021
SUMMARY:Latvia dabas resursu nodoklis (DRN): Latvia: natural resources tax 
 (DRN) quarterly declaration due by the 20th
RRULE:FREQ=MONTHLY;INTERVAL=3;BYMONTHDAY=20
DESCRIPTION:Companies liable for Latvia's natural resources tax (packaging 
 placed on the market\, batteries/tyres\, resource extraction\, emissions\,
  etc.) must submit a quarterly DRN report to VID and pay the tax\; taxpaye
 rs whose calculated annual tax is very low may instead report and pay once
  a year.\n\nWer betroffen ist: Any company liable for DRN\, e.g. those pla
 cing packaged goods\, batteries\, tyres\, or other DRN-taxable products on
  the Latvian market\, or extracting natural resources/emitting pollutants 
 above the exempt thresholds — commonly retail\, e-commerce\, manufacturi
 ng and hospitality businesses.\n\nWas zu tun ist: Submit the quarterly DRN
  report via VID EDS by the 20th of the month following the quarter and pay
  the tax into the single tax account by the 23rd. If your calculated annua
 l DRN at base rates does not exceed €142.29\, you may instead report and
  pay once a year\, by 20 January (report) / 23 January (pay) of the follow
 ing year.\n\nSanktion: Late-payment penalty (nokavējuma nauda) of 0.05% o
 f the outstanding amount per day under Section 29 of the Law On Taxes and 
 Duties.\n\n\nStatus: Bestätigt\nhttps://eudeadlines.eu/de/deadline/lv-drn
 -quarterly-declaration
URL:https://eudeadlines.eu/de/deadline/lv-drn-quarterly-declaration
CATEGORIES:LV,Latvia dabas resursu nodoklis (DRN)
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia dabas resursu nodoklis (DRN): Latvia: natural resources 
 tax (DRN) quarterly declaration due by the 20th — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia dabas resursu nodoklis (DRN): Latvia: natural resources 
 tax (DRN) quarterly declaration due by the 20th — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-oss-vat-return-quarterly@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20261031
DTEND;VALUE=DATE:20261101
SUMMARY:Latvia / EU One Stop Shop (OSS) VAT: Latvia: OSS quarterly VAT retu
 rn due by the end of the following month
RRULE:FREQ=MONTHLY;INTERVAL=3;BYMONTHDAY=-1
DESCRIPTION:Latvia-registered businesses using the EU VAT One Stop Shop (Un
 ion scheme\, for cross-border B2C sales of goods and digital/other service
 s to consumers in other EU member states above the EUR 10\,000 combined th
 reshold) must submit their OSS VAT return via VID's EDS electronically by 
 the last day of the month following each calendar quarter\, and pay any VA
 T due by the same date. The deadline mechanics are set at EU level and are
  identical in every member state\; only the filing portal (EDS for Latvia)
  differs.\n\nWer betroffen ist: Latvia-registered companies selling goods 
 or digital/other services to consumers in other EU member states whose com
 bined cross-border B2C turnover exceeds EUR 10\,000 a year and who use the
  OSS Union scheme instead of registering for VAT in each customer's countr
 y.\n\nWas zu tun ist: Register for the OSS Union scheme in VID's EDS once 
 cross-border B2C sales are expected to exceed EUR 10\,000/year (or opt in 
 voluntarily). File the OSS VAT return and pay VAT due electronically by 30
  April (Q1)\, 31 July (Q2)\, 31 October (Q3) and 31 January (Q4\, followin
 g year).\n\nSanktion: Exclusion from the OSS scheme for repeated non-compl
 iance\, forcing VAT registration in every destination country\; late-payme
 nt interest on VAT paid late\n\nHinweis zum Datum: The dataset previously 
 only carried an Estonia-jurisdiction OSS entry (ee-oss-vat-return-quarterl
 y)\; since a deadline's jurisdiction gates which country profiles see it\,
  Latvia-registered OSS filers need their own entry even though the EU-leve
 l deadline mechanics are identical.\n\nStatus: Bestätigt\nhttps://eudeadl
 ines.eu/de/deadline/lv-oss-vat-return-quarterly
URL:https://eudeadlines.eu/de/deadline/lv-oss-vat-return-quarterly
CATEGORIES:LV,Latvia / EU One Stop Shop (OSS) VAT
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia / EU One Stop Shop (OSS) VAT: Latvia: OSS quarterly VAT 
 return due by the end of the following month — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia / EU One Stop Shop (OSS) VAT: Latvia: OSS quarterly VAT 
 return due by the end of the following month — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-minimum-wage-2027-proposed@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:[indicative date] Latvia minimum wage: Latvia: 2027 minimum monthly
  wage not yet fixed — planned €820\, Ministry of Welfare proposes €8
 35
DESCRIPTION:Latvia's minimum monthly wage is expected to rise again on 1 Ja
 nuary 2027\, but the exact figure is still undecided: government multi-yea
 r planning assumed €820\, while the Ministry of Welfare's updated calcul
 ation suggests €835. The Cabinet of Ministers typically finalises the fo
 llowing year's figure in the autumn budget round.\n\nWer betroffen ist: Ev
 ery employer in Latvia with staff on or near the minimum wage\, including 
 part-time employees whose pro-rata wage is based on it.\n\nWas zu tun ist:
  Do not update payroll systems yet. Track the Cabinet's autumn 2026 budget
  decision (via mk.gov.lv or lm.gov.lv) for the confirmed 2027 figure befor
 e changing contracts or payroll settings.\n\n\nHinweis zum Datum: PROPOSED
 \, not confirmed: the Ministry of Finance's 2024 multi-year plan targets 
 €820 for 2027 (after €780 in 2026)\, but the Ministry of Welfare's 202
 6 recalculation under the standard 46%-of-average-wage formula proposes 
 €835 instead. As of 2026-09-07 no Cabinet regulation has fixed the 2027 
 figure\; historically the decision is taken in the autumn budget process (
 the 2026 figure of €780 was set that way in 2025). Do not treat either n
 umber as final.\n\nStatus: Vorgeschlagen\nhttps://eudeadlines.eu/de/deadli
 ne/lv-minimum-wage-2027-proposed
URL:https://eudeadlines.eu/de/deadline/lv-minimum-wage-2027-proposed
CATEGORIES:LV,Latvia minimum wage
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia minimum wage: Latvia: 2027 minimum monthly wage not yet 
 fixed — planned €820\, Ministry of Welfare proposes €835 — due in 
 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia minimum wage: Latvia: 2027 minimum monthly wage not yet 
 fixed — planned €820\, Ministry of Welfare proposes €835 — due in 
 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-mun-simplified-natural-persons-2027@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270101
DTEND;VALUE=DATE:20270102
SUMMARY:[indicative date] Latvia micro-enterprise tax (MUN): Latvia: propos
 ed simplified 10% micro-enterprise tax for individuals serving other indiv
 iduals
DESCRIPTION:A draft amendment would let self-employed individuals who provi
 de services only to other natural persons (no employees\, turnover ≤ €
 25\,000/year\, not already a general micro-enterprise taxpayer) pay a simp
 lified 10% tax\, well below the current 25% general micro-enterprise tax r
 ate\, cutting red tape for very small service providers (tutors\, hairdres
 sers\, personal trainers\, etc.).\n\nWer betroffen ist: Latvian sole trade
 rs/self-employed individuals providing services exclusively to consumers\,
  with no employees and turnover ≤ €25\,000/year.\n\nWas zu tun ist: If
  you fit this profile\, track the bill's remaining Saeima readings before 
 assuming the 10% rate applies. Continue paying under existing rules (25% m
 icro-enterprise tax or standard personal income tax/social contributions) 
 until the amendment is adopted and published in Latvijas Vēstnesis.\n\n\n
 Hinweis zum Datum: PROPOSED\, not adopted: this Mikrouzņēmumu nodokļa l
 ikums amendment has only conceptual support from the Saeima Budget and Fin
 ance (Tax) Committee as of research date (2026-09-07) and still needs 3 pl
 enary readings. The planned application date is 2027-01-01\, but this is n
 ot yet law and could change or fail.\n\nStatus: Vorgeschlagen\nhttps://eud
 eadlines.eu/de/deadline/lv-mun-simplified-natural-persons-2027
URL:https://eudeadlines.eu/de/deadline/lv-mun-simplified-natural-persons-20
 27
CATEGORIES:LV,Latvia micro-enterprise tax (MUN)
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia micro-enterprise tax (MUN): Latvia: proposed simplified 
 10% micro-enterprise tax for individuals serving other individuals — due
  in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia micro-enterprise tax (MUN): Latvia: proposed simplified 
 10% micro-enterprise tax for individuals serving other individuals — due
  in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:data-act-cloud-switching-fees-end@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270112
DTEND;VALUE=DATE:20270113
SUMMARY:Data Act: Cloud-Anbieter dürfen keine Wechsel- und Datenausgangsge
 bühren mehr verlangen
DESCRIPTION:Ab diesem Datum dürfen Cloud- und Datenverarbeitungsanbieter i
 hren Kunden den Wechsel zu einem anderen Anbieter oder den Export ihrer Da
 ten (Egress) nicht mehr in Rechnung stellen. Verträge müssen bereits ein
 e Kündigung und Migration innerhalb von 30 Tagen ermöglichen\, und Anbie
 ter müssen den Export in maschinenlesbaren Formaten anbieten.\n\nWer betr
 offen ist: Alle Cloud-\, SaaS-\, PaaS- und Hosting-Anbieter mit EU-Kunden\
 ; jedes Unternehmen\, das Cloud-Dienste bezieht\, profitiert.\n\nWas zu tu
 n ist: Anbieter: Streichen Sie Egress- und Wechselgebühren aus Preisliste
 n und Verträgen und veröffentlichen Sie Bedingungen für die Unterstütz
 ung beim Ausstieg. Kunden: Prüfen Sie Ihre Cloud-Verträge auf Ausstiegsk
 lauseln und nutzen Sie die Regeln\, um Migrationen auszuhandeln\; planen S
 ie einen Anbieterwechsel für die Zeit nach Januar 2027\, um Egress-Kosten
  zu vermeiden.\n\n\n\nStatus: Bestätigt\nhttps://eudeadlines.eu/de/deadli
 ne/data-act-cloud-switching-fees-end
URL:https://eudeadlines.eu/de/deadline/data-act-cloud-switching-fees-end
CATEGORIES:EU,Data Act
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Data Act: Cloud-Anbieter dürfen keine Wechsel- und Datenausgan
 gsgebühren mehr verlangen — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Data Act: Cloud-Anbieter dürfen keine Wechsel- und Datenausgan
 gsgebühren mehr verlangen — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:machinery-regulation-applies@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270120
DTEND;VALUE=DATE:20270121
SUMMARY:Machinery Regulation: Maschinenverordnung ersetzt die Maschinenrich
 tlinie: neue CE-Anforderungen einschließlich Cybersicherheit und Software
DESCRIPTION:Die Verordnung (EU) 2023/1230 gilt ohne Übergangsfrist für al
 le Maschinen\, die ab dem 20. Januar 2027 in der EU in Verkehr gebracht we
 rden. Sie ergänzt Anforderungen an Softwaresicherheit\, Schutz vor böswi
 lliger Manipulation\, sich selbst weiterentwickelndes (KI-)Verhalten\, dig
 itale Betriebsanleitungen und eine verpflichtende Bewertung durch Dritte f
 ür bestimmte Hochrisiko-Maschinenkategorien.\n\nWer betroffen ist: Herste
 ller\, Importeure und Händler von Maschinen\, Robotern\, Hebezeugen\, unv
 ollständigen Maschinen und Sicherheitsbauteilen (einschließlich Sicherhe
 itssoftware)\, jeder Größe.\n\nWas zu tun ist: Führen Sie eine Lückena
 nalyse Ihrer bestehenden Maschinenmodelle anhand der grundlegenden Anforde
 rungen in Anhang III durch\, insbesondere zu Cybersicherheit und Steuerung
 ssoftware. Aktualisieren Sie technische Unterlagen\, Risikobeurteilungen u
 nd Konformitätserklärungen\; prüfen Sie\, ob Ihr Produkt in Anhang I Te
 il A fällt und eine notifizierte Stelle erfordert. Entscheiden Sie zwisch
 en digitaler und gedruckter Betriebsanleitung (Papier weiterhin auf Anfrag
 e).\n\nSanktion: National festgelegt\; nicht konforme Maschinen dürfen ni
 cht in Verkehr gebracht werden\n\n\nStatus: Bestätigt\nhttps://eudeadline
 s.eu/de/deadline/machinery-regulation-applies
URL:https://eudeadlines.eu/de/deadline/machinery-regulation-applies
CATEGORIES:EU,Machinery Regulation
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Machinery Regulation: Maschinenverordnung ersetzt die Maschinen
 richtlinie: neue CE-Anforderungen einschließlich Cybersicherheit und Soft
 ware — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Machinery Regulation: Maschinenverordnung ersetzt die Maschinen
 richtlinie: neue CE-Anforderungen einschließlich Cybersicherheit und Soft
 ware — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:battery-passport-qr@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270218
DTEND;VALUE=DATE:20270219
SUMMARY:Battery Regulation: Digitaler Batteriepass verpflichtend für Elekt
 rofahrzeug-\, LV- und Industriebatterien über 2 kWh
DESCRIPTION:Nach der Verordnung (EU) 2023/1542 muss jede Elektrofahrzeugbat
 terie\, jede Batterie für leichte Verkehrsmittel (E-Bikes\, Roller) und j
 ede Industriebatterie über 2 kWh\, die in Verkehr gebracht wird\, einen Q
 R-Code tragen\, der auf einen digitalen Batteriepass mit Angaben zu Chemie
 \, CO2-Fußabdruck\, Rezyklatanteil\, Leistung und Haltbarkeit verweist.\n
 \nWer betroffen ist: Hersteller und Importeure von EV-Batterien\, Batterie
 n für Leichtfahrzeuge (E-Bikes\, Scooter) und Industriebatterien über 2 
 kWh sowie von Produkten\, die solche Batterien enthalten (E-Bikes\, Energi
 espeichersysteme\, Gabelstapler\, Elektrofahrzeuge)\; Händler müssen pr
 üfen\, ob der QR-Code vorhanden ist. Gewöhnliche Verbraucherbatterien (z
 . B. AA/AAA-\, Handy- oder Laptop-Akkus) und Produkte\, die nur solche ent
 halten\, sind nicht erfasst.\n\nWas zu tun ist: Legen Sie fest\, wer die P
 assdaten hält (Sie oder Ihr Zellenlieferant)\, und wählen Sie einen Anbi
 eter für den Batteriepass. Erfassen Sie den verpflichtenden Datensatz je 
 Batteriemodell\, richten Sie eindeutige Kennungen und QR-Codes auf dem Pro
 dukt ein und planen Sie die Aktualisierung der Zustandsdaten (State of Hea
 lth) über die Lebensdauer der Batterie.\n\nSanktion: National festgelegt\
 ; nicht konforme Batterien können vom Markt genommen werden\n\n\nStatus: 
 Bestätigt\nhttps://eudeadlines.eu/de/deadline/battery-passport-qr
URL:https://eudeadlines.eu/de/deadline/battery-passport-qr
CATEGORIES:EU,Battery Regulation
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Battery Regulation: Digitaler Batteriepass verpflichtend für E
 lektrofahrzeug-\, LV- und Industriebatterien über 2 kWh — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Battery Regulation: Digitaler Batteriepass verpflichtend für E
 lektrofahrzeug-\, LV- und Industriebatterien über 2 kWh — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-epr-eee-battery-annual-report@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:Latvia extended producer responsibility (EPR) — EEE & batteries: 
 Latvia: electrical/electronic equipment & battery producer — annual audi
 ted EPR report due 30 April
RRULE:FREQ=YEARLY;BYMONTH=4;BYMONTHDAY=30
DESCRIPTION:Producers registered under Latvia's extended producer responsib
 ility (EPR) system for electrical/electronic equipment and batteries ('env
 ironmentally harmful goods') must submit an audited annual report to the S
 tate Environmental Service (VVD) covering the previous calendar year (1 Ja
 nuary-31 December)\, by 30 April.\n\nWer betroffen ist: Latvia companies t
 hat place electrical/electronic equipment or batteries on the market and a
 re registered producers under the EPR system\, e.g. consumer-electronics i
 mporters and retailers.\n\nWas zu tun ist: Compile your annual EEE/battery
  placed-on-market data\, have it audited as required by your EPR scheme\, 
 and submit the annual report to VVD (electronically\, pasts@vvd.gov.lv) by
  30 April covering the previous calendar year.\n\n\n\nStatus: Bestätigt\n
 https://eudeadlines.eu/de/deadline/lv-epr-eee-battery-annual-report
URL:https://eudeadlines.eu/de/deadline/lv-epr-eee-battery-annual-report
CATEGORIES:LV,Latvia extended producer responsibility (EPR) — EEE & batte
 ries
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia extended producer responsibility (EPR) — EEE & batteri
 es: Latvia: electrical/electronic equipment & battery producer — annual 
 audited EPR report due 30 April — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia extended producer responsibility (EPR) — EEE & batteri
 es: Latvia: electrical/electronic equipment & battery producer — annual 
 audited EPR report due 30 April — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-epr-packaging-annual-report@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270430
DTEND;VALUE=DATE:20270501
SUMMARY:Latvia extended producer responsibility (EPR) — packaging: Latvia
 : packaging & single-use tableware producer — annual audited EPR report 
 due 30 April
RRULE:FREQ=YEARLY;BYMONTH=4;BYMONTHDAY=30
DESCRIPTION:Producers registered under Latvia's extended producer responsib
 ility (EPR) system for packaging and single-use tableware must submit an a
 udited annual report to the State Environmental Service (VVD) covering the
  previous calendar year (1 January-31 December)\, by 30 April.\n\nWer betr
 offen ist: Latvia companies that place packaging or single-use tableware o
 n the market and are registered producers under the EPR system. This is th
 e producer-responsibility reporting duty owed to VVD\, separate from the q
 uarterly dabas resursu nodoklis (DRN) tax declaration filed with VID.\n\nW
 as zu tun ist: Compile your annual packaging/single-use-tableware placed-o
 n-market data\, have it audited as required by your EPR scheme\, and submi
 t the report to VVD (electronically\, pasts@vvd.gov.lv) by 30 April coveri
 ng the previous calendar year.\n\n\n\nStatus: Bestätigt\nhttps://eudeadli
 nes.eu/de/deadline/lv-epr-packaging-annual-report
URL:https://eudeadlines.eu/de/deadline/lv-epr-packaging-annual-report
CATEGORIES:LV,Latvia extended producer responsibility (EPR) — packaging
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia extended producer responsibility (EPR) — packaging: La
 tvia: packaging & single-use tableware producer — annual audited EPR rep
 ort due 30 April — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia extended producer responsibility (EPR) — packaging: La
 tvia: packaging & single-use tableware producer — annual audited EPR rep
 ort due 30 April — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-annual-report-yearly-micro-small@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270531
DTEND;VALUE=DATE:20270601
SUMMARY:Latvia annual report filing: Latvia: annual report (gada pārskats)
  yearly filing deadline for micro and small companies
RRULE:FREQ=YEARLY;BYMONTH=5;BYMONTHDAY=-1
DESCRIPTION:Latvia-registered micro and small companies must prepare\, have
  members/shareholders approve\, and electronically file their annual repor
 t with the State Revenue Service (VID) within 5 months of financial year-e
 nd. For calendar-year filers that means 31 May every year. Filing is done 
 through VID's EDS electronic declaration system.\n\nWer betroffen ist: All
  Latvia-registered micro and small companies and equivalent entities (not 
 exceeding 2 of: €4M balance sheet\, €8M net turnover\, 50 employees).\
 n\nWas zu tun ist: Close the books\, get the annual report approved by sha
 reholders/members\, and file via VID EDS by 31 May every year (or within 5
  months of a non-calendar year-end). Include an auditor's opinion if requi
 red by your statutes\, size thresholds\, or a shareholder decision.\n\nSan
 ktion: Administrative liability for late filing/failure to submit under th
 e Gada pārskatu un konsolidēto gada pārskatu likums.\n\nHinweis zum Dat
 um: Recurring version of the former one-off entry lv-annual-report-filing-
 micro-small: 5 months after financial year-end under the Gada pārskatu un
  konsolidēto gada pārskatu likums\, i.e. 31 May for a standard 1 Jan–3
 1 Dec financial year.\n\nStatus: Bestätigt\nhttps://eudeadlines.eu/de/dea
 dline/lv-annual-report-yearly-micro-small
URL:https://eudeadlines.eu/de/deadline/lv-annual-report-yearly-micro-small
CATEGORIES:LV,Latvia annual report filing
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia annual report filing: Latvia: annual report (gada pārsk
 ats) yearly filing deadline for micro and small companies — due in 7 day
 s
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia annual report filing: Latvia: annual report (gada pārsk
 ats) yearly filing deadline for micro and small companies — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-self-employed-annual-income-declaration@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270601
DTEND;VALUE=DATE:20270602
SUMMARY:Latvia personal income tax (IIN) — annual declaration: Latvia: ma
 ndatory annual income declaration (gada ienākumu deklarācija) due 1 June
RRULE:FREQ=YEARLY;BYMONTH=6;BYMONTHDAY=1
DESCRIPTION:Latvian residents required to file a mandatory annual income de
 claration (gada ienākumu deklarācija) — including anyone with income f
 rom saimnieciskā darbība (self-employed/business activity) — must subm
 it it for the previous calendar year between 1 March and 1 June\, and pay 
 any additional personal income tax (IIN) due by 23 June.\n\nWer betroffen 
 ist: Latvian self-employed individuals/sole traders (e.g. an outsourced ac
 countant working for themselves) and anyone else the Law On Personal Incom
 e Tax requires to file a mandatory annual declaration. For a self-employed
  person this is a separate\, additional filing on top of their quarterly V
 SAOI/IIN reports.\n\nWas zu tun ist: Prepare your income and expense summa
 ry for the previous calendar year and file the gada ienākumu deklarācija
  via VID EDS between 1 March and 1 June. Pay any additional IIN due by 23 
 June of the same year.\n\nSanktion: Late-filing/late-payment penalties und
 er the Law On Personal Income Tax and the Law On Taxes and Duties (nokavē
 juma nauda of 0.05% per day on unpaid tax)\; exact late-filing fine amount
  not confirmed from a source fetched this session.\n\n\nStatus: Bestätigt
 \nhttps://eudeadlines.eu/de/deadline/lv-self-employed-annual-income-declar
 ation
URL:https://eudeadlines.eu/de/deadline/lv-self-employed-annual-income-decla
 ration
CATEGORIES:LV,Latvia personal income tax (IIN) — annual declaration
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia personal income tax (IIN) — annual declaration: Latvia
 : mandatory annual income declaration (gada ienākumu deklarācija) due 1 
 June — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia personal income tax (IIN) — annual declaration: Latvia
 : mandatory annual income declaration (gada ienākumu deklarācija) due 1 
 June — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:pay-transparency-first-gender-pay-gap-report@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270607
DTEND;VALUE=DATE:20270608
SUMMARY:Pay Transparency Directive: Entgelttransparenz: erster Bericht zum 
 geschlechtsspezifischen Entgeltgefälle für Arbeitgeber mit 150+ Beschäf
 tigten fällig
DESCRIPTION:Die Richtlinie (EU) 2023/970 verpflichtet Arbeitgeber\, Gehalts
 spannen vor Vorstellungsgesprächen offenzulegen\, Bewerber nicht mehr nac
 h ihrer Gehaltshistorie zu fragen\, Beschäftigten ein Auskunftsrecht übe
 r das Durchschnittsentgelt je Kategorie einzuräumen und – bei 150 oder 
 mehr Beschäftigten – Kennzahlen zum geschlechtsspezifischen Entgeltgef
 älle für 2026 bis Juni 2027 zu melden (250+ jährlich\, 150-249 alle dre
 i Jahre). Ein Gefälle über 5 % ohne objektive Rechtfertigung löst eine 
 gemeinsame Entgeltbewertung aus.\n\nWer betroffen ist: Alle Arbeitgeber hi
 nsichtlich der Transparenzrechte\; mittlere und große Arbeitgeber mit 100
 + Beschäftigten hinsichtlich der Berichterstattung zum Entgeltgefälle.\n
 \nWas zu tun ist: Richten Sie objektive\, geschlechtsneutrale Tätigkeitsk
 ategorien und Gehaltsbänder ein. Nehmen Sie Gehaltsspannen in Stellenanze
 igen auf oder teilen Sie sie vor dem Vorstellungsgespräch mit und streich
 en Sie Fragen zur Gehaltshistorie. Arbeitgeber mit 150+ Beschäftigten: Be
 reiten Sie die Gehaltsdaten 2026 nach Geschlecht und Kategorie für den Be
 richt im Juni 2027 auf und prüfen Sie das nationale Recht Ihres Landes f
 ür das genaue Berichtsformat.\n\nSanktion: National festgelegt\; umfasst 
 Geldbußen und Entschädigungsansprüche mit umgekehrter Beweislast\n\nHin
 weis zum Datum: Umsetzungsfrist war der 2026-06-07\; viele Mitgliedstaaten
  (u. a. Lettland\, Polen\, Deutschland\, Frankreich) waren verspätet\, na
 tionale Termine können sich daher leicht verschieben. Arbeitgeber mit 100
 -149 Beschäftigten berichten erstmals bis zum 2031-06-07\n\nStatus: Best
 ätigt\nhttps://eudeadlines.eu/de/deadline/pay-transparency-first-gender-p
 ay-gap-report
URL:https://eudeadlines.eu/de/deadline/pay-transparency-first-gender-pay-ga
 p-report
CATEGORIES:EU,Pay Transparency Directive
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Pay Transparency Directive: Entgelttransparenz: erster Bericht 
 zum geschlechtsspezifischen Entgeltgefälle für Arbeitgeber mit 150+ Besc
 häftigten fällig — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Pay Transparency Directive: Entgelttransparenz: erster Bericht 
 zum geschlechtsspezifischen Entgeltgefälle für Arbeitgeber mit 150+ Besc
 häftigten fällig — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eudr-micro-small-operators@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270630
DTEND;VALUE=DATE:20270701
SUMMARY:EUDR: EU-Entwaldungsverordnung: Sorgfaltspflichten gelten für Klei
 nst- und Kleinunternehmen
DESCRIPTION:Kleinst- und Kleinunternehmen\, die mit EUDR-Rohstoffen handeln
  (Rinder\, Kakao\, Kaffee\, Palmöl\, Kautschuk\, Soja\, Holz und daraus h
 ergestellte Erzeugnisse)\, erhalten sechs Monate zusätzlich. Kleine nachg
 elagerte Händler müssen vor allem die Referenznummern der vorgelagerten 
 Sorgfaltserklärungen erfassen und weitergeben\; kleine Primärerzeuger in
  Ländern mit geringem Risiko geben eine vereinfachte Erklärung ab.\n\nWe
 r betroffen ist: Kleinst- und kleine Importeure\, Holz- und Möbelherstell
 er\, Kaffeeröstereien\, Schokoladenhersteller\, Druckereien und Einzelhä
 ndler der erfassten Erzeugnisse.\n\nWas zu tun ist: Prüfen Sie\, ob Ihre 
 Produkte in Anhang I der EUDR aufgeführt sind. Fragen Sie Ihre Lieferante
 n nach den Referenznummern ihrer Sorgfaltserklärungen und bewahren Sie di
 ese fünf Jahre auf. Wenn Sie direkt importieren\, registrieren Sie sich i
 m EU-Informationssystem und bereiten Sie Geolokalisierungs- und Legalität
 snachweise vor.\n\nSanktion: Geldbußen von mindestens 4 % des EU-Umsatzes
 \, Einziehung von Waren\, Ausschluss von öffentlichen Vergabeverfahren\n\
 nHinweis zum Datum: Verschoben durch Verordnung (EU) 2025/2650\; Kleinst- 
 und Klein-Primärerzeuger in Ländern mit geringem Risiko geben nur eine e
 inmalige vereinfachte Erklärung ab\n\nStatus: Verschoben\nhttps://eudeadl
 ines.eu/de/deadline/eudr-micro-small-operators
URL:https://eudeadlines.eu/de/deadline/eudr-micro-small-operators
CATEGORIES:EU,EUDR
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EUDR: EU-Entwaldungsverordnung: Sorgfaltspflichten gelten für 
 Kleinst- und Kleinunternehmen — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:EUDR: EU-Entwaldungsverordnung: Sorgfaltspflichten gelten für 
 Kleinst- und Kleinunternehmen — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:instant-payments-non-euro-vop@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270709
DTEND;VALUE=DATE:20270710
SUMMARY:Instant Payments Regulation: Sofortzahlungsverordnung: Senden von E
 uro-Echtzeitüberweisungen und Empfängerprüfung verpflichtend für Banke
 n außerhalb des Euroraums (Polen\, Schweden\, Tschechien usw.)
DESCRIPTION:Zahlungsdienstleister in EU-Ländern außerhalb des Euroraums m
 üssen ab Juli 2027 Euro-Echtzeitüberweisungen und die kostenlose Namens-
 /IBAN-Prüfung (Verification of Payee) anbieten\; damit ist die Einführun
 g EU-weit abgeschlossen.\n\nWer betroffen ist: Banken und Zahlungsinstitut
 e in Mitgliedstaaten außerhalb des Euroraums\; Unternehmen in Polen\, Sch
 weden\, Tschechien\, Ungarn\, Dänemark\, Rumänien und Bulgarien\, die Eu
 ro zahlen oder empfangen.\n\nWas zu tun ist: Unternehmen in Nicht-Euro-Lä
 ndern: Gleichen Sie Lieferanten- und Kundenstammdaten (rechtliche Namen vs
 . Kontoinhaber) vor der Aktivierung der Empfängerprüfung ab\, um abgeleh
 nte oder verzögerte Euro-Zahlungen zu vermeiden\; fragen Sie Ihre Bank na
 ch ihrem Zeitplan.\n\n\nHinweis zum Datum: Der Empfang von Euro-Echtzeitü
 berweisungen ist für Zahlungsdienstleister außerhalb des Euroraums ab 20
 27-01-09 verpflichtend\; Senden und Empfängerprüfung ab 2027-07-09\n\nSt
 atus: Bestätigt\nhttps://eudeadlines.eu/de/deadline/instant-payments-non-
 euro-vop
URL:https://eudeadlines.eu/de/deadline/instant-payments-non-euro-vop
CATEGORIES:EU,Instant Payments Regulation
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Instant Payments Regulation: Sofortzahlungsverordnung: Senden v
 on Euro-Echtzeitüberweisungen und Empfängerprüfung verpflichtend für B
 anken außerhalb des Euroraums (Polen\, Schweden\, Tschechien usw.) — du
 e in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Instant Payments Regulation: Sofortzahlungsverordnung: Senden v
 on Euro-Echtzeitüberweisungen und Empfängerprüfung verpflichtend für B
 anken außerhalb des Euroraums (Polen\, Schweden\, Tschechien usw.) — du
 e in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-annual-report-yearly-medium-large@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270731
DTEND;VALUE=DATE:20270801
SUMMARY:Latvia annual report filing: Latvia: annual report (gada pārskats)
  yearly filing deadline for medium and large companies
RRULE:FREQ=YEARLY;BYMONTH=7;BYMONTHDAY=-1
DESCRIPTION:Latvia-registered medium and large companies\, and parent compa
 nies preparing consolidated annual reports\, must file their VID-submitted
  annual report — including the required audit opinion — within 7 month
 s of financial year-end (31 July every year for calendar-year filers).\n\n
 Wer betroffen ist: Latvia-registered medium and large companies/groups and
  consolidated-report parent companies (those exceeding the small-company t
 hresholds).\n\nWas zu tun ist: Engage a statutory auditor early\, get the 
 report approved by shareholders\, and file via VID EDS by 31 July every ye
 ar (or within 7 months of a non-calendar year-end).\n\nSanktion: Administr
 ative liability for late filing/failure to submit under the Gada pārskatu
  un konsolidēto gada pārskatu likums.\n\nHinweis zum Datum: Recurring ve
 rsion of the former one-off entry lv-annual-report-filing-medium-large: 7 
 months after financial year-end under the Gada pārskatu un konsolidēto g
 ada pārskatu likums\, i.e. 31 July for a standard 1 Jan–31 Dec financia
 l year.\n\nStatus: Bestätigt\nhttps://eudeadlines.eu/de/deadline/lv-annua
 l-report-yearly-medium-large
URL:https://eudeadlines.eu/de/deadline/lv-annual-report-yearly-medium-large
CATEGORIES:LV,Latvia annual report filing
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia annual report filing: Latvia: annual report (gada pārsk
 ats) yearly filing deadline for medium and large companies — due in 7 da
 ys
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia annual report filing: Latvia: annual report (gada pārsk
 ats) yearly filing deadline for medium and large companies — due in 1 da
 y
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:ai-act-gpai-legacy-models@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270802
DTEND;VALUE=DATE:20270803
SUMMARY:AI Act: vor August 2025 in Verkehr gebrachte GPAI-Modelle müssen d
 ie Anforderungen erfüllen
DESCRIPTION:KI-Modelle mit allgemeinem Verwendungszweck\, die bereits vor d
 em 2. August 2025 auf dem Markt waren\, erhielten zwei Jahre\, um nachzuzi
 ehen. Ab diesem Datum müssen sie dieselben Pflichten zu Dokumentation\, U
 rheberrecht und Trainingsdaten-Zusammenfassung erfüllen wie neue Modelle.
 \n\nWer betroffen ist: Anbieter älterer Foundation Models\, die weiterhin
  in der EU angeboten werden\, einschließlich Unternehmen\, die solche Mod
 elle feinabgestimmt und veröffentlicht haben.\n\nWas zu tun ist: Inventar
 isieren Sie die von Ihnen bereitgestellten Modelle und deren Veröffentlic
 hungsdaten. Ergänzen Sie für Altmodelle nachträglich die technische Dok
 umentation\, die Informationspakete für nachgelagerte Anbieter und die Zu
 sammenfassung der Trainingsdaten oder nehmen Sie die Modelle vom Markt.\n\
 nSanktion: Bis zu 15 Mio. € oder 3 % des weltweiten Umsatzes\n\n\nStatus
 : Bestätigt\nhttps://eudeadlines.eu/de/deadline/ai-act-gpai-legacy-models
URL:https://eudeadlines.eu/de/deadline/ai-act-gpai-legacy-models
CATEGORIES:EU,EU AI Act
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: vor August 2025 in Verkehr gebrachte GPAI-Modelle müss
 en die Anforderungen erfüllen — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: vor August 2025 in Verkehr gebrachte GPAI-Modelle müss
 en die Anforderungen erfüllen — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:battery-due-diligence@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270818
DTEND;VALUE=DATE:20270819
SUMMARY:Battery Regulation: Batterieverordnung: Sorgfaltspflichten in der L
 ieferkette gelten
DESCRIPTION:Unternehmen\, die Batterien in der EU in Verkehr bringen\, müs
 sen ein Sorgfaltspflichtensystem für Rohstoffe wie Kobalt\, Lithium\, Nic
 kel und Naturgraphit betreiben: Lieferkettenstrategie\, Risikoermittlung\,
  Überprüfung durch Dritte und öffentliche Berichterstattung. Unternehme
 n mit einem Nettoumsatz unter 40 Mio. € sind ausgenommen.\n\nWer betroff
 en ist: Größere Batteriehersteller und -importeure (Umsatz ab 40 Mio. 
 €)\; kleinere Firmen sollten mit Informationsanfragen von betroffenen Ku
 nden rechnen.\n\nWas zu tun ist: Wenn Ihr Umsatz 40 Mio. € oder mehr bet
 rägt\, führen Sie eine an den OECD-Leitsätzen ausgerichtete Sorgfaltspf
 lichtenstrategie für Batterierohstoffe ein\, erfassen Sie Ihre Zellen- un
 d Materiallieferanten und veranlassen Sie eine Überprüfung durch Dritte.
  Kleinere Lieferanten: Bereiten Sie sich darauf vor\, Sorgfaltspflichten-F
 ragebögen Ihrer Kunden zu beantworten.\n\n\nHinweis zum Datum: Vom 2025-0
 8-18 verschoben durch Verordnung (EU) 2025/1561\n\nStatus: Verschoben\nhtt
 ps://eudeadlines.eu/de/deadline/battery-due-diligence
URL:https://eudeadlines.eu/de/deadline/battery-due-diligence
CATEGORIES:EU,Battery Regulation
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Battery Regulation: Batterieverordnung: Sorgfaltspflichten in d
 er Lieferkette gelten — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Battery Regulation: Batterieverordnung: Sorgfaltspflichten in d
 er Lieferkette gelten — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:cbam-first-declaration-certificates@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:CBAM: erste Jahreserklärung und Abgabe von Zertifikaten für Einfu
 hren 2026 von Stahl\, Aluminium\, Zement und Düngemitteln
DESCRIPTION:Seit dem 1. Januar 2026 müssen Importeure von mehr als 50 Tonn
 en CBAM-Waren pro Jahr (Eisen und Stahl\, Aluminium\, Zement\, Düngemitte
 l\; zusätzlich Wasserstoff und Strom ohne Schwellenwert) zugelassene CBAM
 -Anmelder sein und CBAM-Zertifikate kaufen\, die die eingebetteten Emissio
 nen abdecken. Die erste Jahreserklärung und Zertifikatsabgabe für die Ei
 nfuhren 2026 ist 2027 fällig. Importeure unter 50 Tonnen sind ausgenommen
 \, müssen den Schwellenwert aber im Blick behalten.\n\nWer betroffen ist:
  Jedes Unternehmen\, das die genannten Waren von außerhalb der EU importi
 ert\, einschließlich kleiner Hersteller\, Bauunternehmen und Händler\, d
 ie Stahl- oder Aluminiumprodukte direkt von Lieferanten außerhalb der EU 
 beziehen.\n\nWas zu tun ist: Verfolgen Sie die kumulierten jährlichen Ein
 fuhren von CBAM-Waren nach Gewicht\, um zu wissen\, ob Sie die 50-Tonnen-G
 renze überschreiten. Falls ja\, stellen Sie sicher\, dass Ihnen der Statu
 s als zugelassener Anmelder erteilt wurde\, erheben Sie die tatsächlichen
  Emissionsdaten Ihrer Lieferanten (oder verwenden Sie Standardwerte)\, kau
 fen Sie im Laufe von 2027 Zertifikate und reichen Sie die Erklärung frist
 gerecht im CBAM-Register ein.\n\nSanktion: Sanktion je nicht abgegebenem Z
 ertifikat\, zusätzlich Entzug der Zulassung bei wiederholten Verstößen\
 n\nHinweis zum Datum: Endgültige Phase begann am 2026-01-01\; Importeure 
 mit mehr als 50 Tonnen/Jahr mussten bis zum 2026-03-31 den Status als zuge
 lassener CBAM-Anmelder beantragen. Erklärungsfrist gemäß der CBAM-Verei
 nfachungsverordnung von 2025 – bestätigen Sie dies bei Ihrer nationalen
  CBAM-Behörde\n\nStatus: Bestätigt\nhttps://eudeadlines.eu/de/deadline/c
 bam-first-declaration-certificates
URL:https://eudeadlines.eu/de/deadline/cbam-first-declaration-certificates
CATEGORIES:EU,CBAM
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:CBAM: erste Jahreserklärung und Abgabe von Zertifikaten für E
 infuhren 2026 von Stahl\, Aluminium\, Zement und Düngemitteln — due in 
 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:CBAM: erste Jahreserklärung und Abgabe von Zertifikaten für E
 infuhren 2026 von Stahl\, Aluminium\, Zement und Düngemitteln — due in 
 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:dac8-crypto-first-report@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20270930
DTEND;VALUE=DATE:20271001
SUMMARY:DAC8: erste jährliche Meldung von Kryptowerte-Transaktionen an die
  Steuerbehörden (für 2026)
DESCRIPTION:Seit dem 1. Januar 2026 müssen Anbieter von Kryptowerte-Dienst
 leistungen (Börsen\, Broker\, Anbieter von Verwahr-Wallets\, einige DeFi-
 Frontends) die Identität und steuerliche Ansässigkeit ihrer Kunden erheb
 en und überprüfen sowie alle Tausch- und Transfertransaktionen von EU-Nu
 tzern aufzeichnen. Die erste jährliche Meldung an die Steuerbehörde ist 
 2027 fällig\, und die Daten werden zwischen den Mitgliedstaaten ausgetaus
 cht. DAC7 verpflichtet digitale Plattformen bereits zu einer ähnlichen j
 ährlichen Meldung (bis 31. Januar) über Verkäufer.\n\nWer betroffen ist
 : Jedes Unternehmen\, das EU-Kunden Krypto-Tausch-\, Transfer- oder Verwah
 rdienste anbietet\, einschließlich nach MiCA zugelassener Firmen und Nich
 t-EU-Anbieter\, die EU-Nutzer bedienen.\n\nWas zu tun ist: Registrieren Si
 e sich als meldender Anbieter von Kryptowerte-Dienstleistungen in einem Mi
 tgliedstaat\, sofern Sie nicht nach MiCA zugelassen sind. Holen Sie Selbst
 auskünfte (Name\, Adresse\, Steuer-Identifikationsnummer\, steuerliche An
 sässigkeit) von allen Nutzern ein\, führen Sie Transaktionsaufzeichnunge
 n ab dem 1. Januar 2026 und richten Sie die XML-Meldung im nationalen Form
 at vor der ersten Frist ein.\n\nSanktion: National festgelegt\; in der Reg
 el Geldbußen pro nicht gemeldetem Nutzer bzw. Transaktion\n\nHinweis zum 
 Datum: Meldepflicht gilt ab 2026-01-01\; laut Kommission ist die erste Mel
 dung innerhalb von neun Monaten nach Ende des Jahres 2026 fällig – nati
 onale Gesetze können ein früheres Datum vorsehen (z. B. 31. Januar)\, pr
 üfen Sie Ihren Mitgliedstaat\n\nStatus: Bestätigt\nhttps://eudeadlines.e
 u/de/deadline/dac8-crypto-first-report
URL:https://eudeadlines.eu/de/deadline/dac8-crypto-first-report
CATEGORIES:EU,DAC8
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:DAC8: erste jährliche Meldung von Kryptowerte-Transaktionen an
  die Steuerbehörden (für 2026) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:DAC8: erste jährliche Meldung von Kryptowerte-Transaktionen an
  die Steuerbehörden (für 2026) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-safety-instruction-renewal@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271001
DTEND;VALUE=DATE:20271002
SUMMARY:Latvia occupational safety — repeated safety instruction: Latvia:
  repeated occupational safety instruction (atkārtotā instruktāža) due 
 at least yearly\, every 6 months for hazardous work
RRULE:FREQ=YEARLY;BYMONTH=10;BYMONTHDAY=1
DESCRIPTION:Employers must give every employee repeated occupational safety
  instruction (atkārtotā instruktāža) covering the same scope as their 
 initial instruction\, at least once every 12 months for standard work\; em
 ployees doing hazardous-equipment or increased-risk work (per the employer
 's own approved list) must be re-instructed at least once every 6 months.\
 n\nWer betroffen ist: Every registered employer in Latvia with at least on
 e employee\, of any size or sector.\n\nWas zu tun ist: Track each employee
 's last safety-instruction date and schedule the next one within 12 months
  (6 months for staff on hazardous-equipment/increased-risk work\, per your
  own approved list). Keep signed instruction logs on file for VDI inspecti
 on.\n\nSanktion: VDI administrative enforcement under the Darba aizsardzī
 bas likums for missing or overdue instruction\; specific fine amounts not 
 confirmed from a source fetched this session.\n\nHinweis zum Datum: Not a 
 shared calendar deadline: MK noteikumi Nr. 749 'Apmācības kārtība darb
 a aizsardzības jautājumos' (in force since 2010-10-01)\, §23\, requires
  repeated instruction at least once every 12 months for standard work\, an
 d at least once every 6 months for work with hazardous equipment or on the
  employer's approved increased-risk-work list\, counted from each employee
 's previous instruction. The date shown is an illustrative annual placehol
 der\, not everyone's actual due date.\n\nStatus: Bestätigt\nhttps://eudea
 dlines.eu/de/deadline/lv-safety-instruction-renewal
URL:https://eudeadlines.eu/de/deadline/lv-safety-instruction-renewal
CATEGORIES:LV,Latvia occupational safety — repeated safety instruction
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia occupational safety — repeated safety instruction: Lat
 via: repeated occupational safety instruction (atkārtotā instruktāža) 
 due at least yearly\, every 6 months for hazardous work — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia occupational safety — repeated safety instruction: Lat
 via: repeated occupational safety instruction (atkārtotā instruktāža) 
 due at least yearly\, every 6 months for hazardous work — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:lv-risk-assessment-renewal@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271002
DTEND;VALUE=DATE:20271003
SUMMARY:Latvia occupational safety — work environment risk assessment: La
 tvia: work environment risk assessment must be reviewed at least once a ye
 ar
RRULE:FREQ=YEARLY;BYMONTH=10;BYMONTHDAY=2
DESCRIPTION:Every employer must have a written work environment risk assess
 ment (darba vides risku novērtējums) and must review and update it at le
 ast once every 12 months\, and additionally whenever work activities\, pro
 cesses or conditions change materially\, a legal non-compliance is found\,
  or a workplace accident occurs.\n\nWer betroffen ist: Every registered em
 ployer in Latvia with at least one employee\, of any size or sector — in
 cluding a one-person office with a single hired employee.\n\nWas zu tun is
 t: Note the date of your most recent work environment risk assessment and 
 calendar a review no later than 12 months after it. Redo the review immedi
 ately if you change premises\, equipment or ways of working\, if VDI finds
  a non-compliance\, or after any workplace accident. Keep the assessment a
 nd its review history on file for VDI inspection.\n\nSanktion: VDI adminis
 trative enforcement under the Darba aizsardzības likums for missing or ou
 tdated risk assessments\; specific fine amounts not confirmed from a sourc
 e fetched this session.\n\nHinweis zum Datum: Not a shared calendar deadli
 ne: MK noteikumi Nr. 660 'Darba vides iekšējās uzraudzības veikšanas 
 kārtība' (in force since 2007) requires the review at least once every 1
 2 months\, counted from your own company's previous risk assessment\, plus
  immediately after a workplace/process change\, an accident\, or detected 
 non-compliance (§18)\; the internal-uzraudzība system as a whole must al
 so be checked at least once a year (§40). The date shown is an illustrati
 ve annual placeholder\, not everyone's actual due date — calendar your o
 wn review 12 months after your last one.\n\nStatus: Bestätigt\nhttps://eu
 deadlines.eu/de/deadline/lv-risk-assessment-renewal
URL:https://eudeadlines.eu/de/deadline/lv-risk-assessment-renewal
CATEGORIES:LV,Latvia occupational safety — work environment risk assessme
 nt
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia occupational safety — work environment risk assessment
 : Latvia: work environment risk assessment must be reviewed at least once 
 a year — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Latvia occupational safety — work environment risk assessment
 : Latvia: work environment risk assessment must be reviewed at least once 
 a year — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:ai-act-high-risk-annex-iii@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271202
DTEND;VALUE=DATE:20271203
SUMMARY:AI Act: Hochrisiko-Pflichten für Anwendungsfälle nach Anhang III 
 (Personalwesen\, Kredit\, Bildung\, Biometrie\, kritische Infrastruktur)
DESCRIPTION:KI für Personalauswahl und Mitarbeiterführung\, Kreditscoring
 \, Versicherungstarifierung\, Zulassung zu Bildungseinrichtungen\, biometr
 ische Identifizierung\, kritische Infrastruktur und Strafverfolgung wird z
 u „Hochrisiko-KI“. Anbieter brauchen ein Risikomanagementsystem\, Date
 n-Governance\, technische Dokumentation\, Protokollierung\, menschliche Au
 fsicht und eine Konformitätsbewertung\; Betreiber müssen die Systeme gem
 äß Anleitung verwenden\, Protokolle aufbewahren und betroffene Personen 
 informieren.\n\nWer betroffen ist: Unternehmen\, die solche KI-Systeme ent
 wickeln\, sowie jeder Arbeitgeber oder Kreditgeber\, der sie einsetzt (Bet
 reiberpflichten)\, unabhängig von der Größe. KMU erhalten vereinfachte 
 Dokumentationsvorlagen.\n\nWas zu tun ist: Gleichen Sie jedes KI-System\, 
 das Sie entwickeln oder nutzen\, mit Anhang III ab. Legen Sie für betroff
 ene Systeme jetzt eine Compliance-Akte an: Zweckbestimmung\, Risikobewertu
 ng\, Beschreibung der Trainingsdaten\, Konzept der menschlichen Aufsicht\,
  Tests zu Genauigkeit und Cybersicherheit. Betreiber: Beschaffen Sie die A
 nbieterdokumentation\, benennen Sie eine aufsichtführende Person und bere
 iten Sie Informationen für die Beschäftigten vor. Registrieren Sie Syste
 me vor der Nutzung in der EU-Datenbank.\n\nSanktion: Bis zu 15 Mio. € od
 er 3 % des weltweiten Umsatzes (KMU: der niedrigere Betrag)\n\nHinweis zum
  Datum: Vom 2026-08-02 verschoben durch den Digital Omnibus zu KI\, Verord
 nung (EU) 2026/1744 (ABl. 2026-07-24\, in Kraft seit 2026-07-27)\n\nStatus
 : Verschoben\nhttps://eudeadlines.eu/de/deadline/ai-act-high-risk-annex-ii
 i
URL:https://eudeadlines.eu/de/deadline/ai-act-high-risk-annex-iii
CATEGORIES:EU,EU AI Act
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: Hochrisiko-Pflichten für Anwendungsfälle nach Anhang 
 III (Personalwesen\, Kredit\, Bildung\, Biometrie\, kritische Infrastruktu
 r) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:AI Act: Hochrisiko-Pflichten für Anwendungsfälle nach Anhang 
 III (Personalwesen\, Kredit\, Bildung\, Biometrie\, kritische Infrastruktu
 r) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:cra-full-application@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271211
DTEND;VALUE=DATE:20271212
SUMMARY:Cyber Resilience Act: CRA: vollständige Anwendung – Secure-by-De
 sign-Anforderungen\, Konformitätsbewertung und CE-Kennzeichnung für Soft
 ware und vernetzte Produkte
DESCRIPTION:Ab diesem Datum muss jedes in der EU in Verkehr gebrachte Produ
 kt mit digitalen Elementen die grundlegenden Cybersicherheitsanforderungen
  erfüllen (sichere Voreinstellungen\, keine bekannten ausnutzbaren Schwac
 hstellen\, Sicherheitsupdates während des Unterstützungszeitraums\, SBOM
 )\, eine Konformitätsbewertung bestehen und die CE-Kennzeichnung tragen. 
 Importeure und Händler müssen die Konformität prüfen.\n\nWer betroffen
  ist: Hersteller\, Importeure und Händler von Software und vernetzter Har
 dware\, die in der EU verkauft wird\, einschließlich kleiner SaaS-Anbiete
 r mit Client-Software\, IoT-Hersteller und App-Entwickler.\n\nWas zu tun i
 st: Klassifizieren Sie jedes Produkt (Standard\, wichtig Klasse I/II oder 
 kritisch)\, um zu wissen\, ob eine Selbstbewertung ausreicht. Führen Sie 
 einen sicheren Entwicklungszyklus\, ein Schwachstellenmanagement und eine 
 Update-Richtlinie ein und erstellen Sie eine SBOM. Bereiten Sie die techni
 sche Dokumentation\, die EU-Konformitätserklärung und Sicherheitsinforma
 tionen für Nutzer vor. Legen Sie den Unterstützungszeitraum des Produkts
  fest (standardmäßig mindestens 5 Jahre).\n\nSanktion: Bis zu 15 Mio. 
 € oder 2\,5 % des weltweiten Umsatzes\n\n\nStatus: Bestätigt\nhttps://e
 udeadlines.eu/de/deadline/cra-full-application
URL:https://eudeadlines.eu/de/deadline/cra-full-application
CATEGORIES:EU,Cyber Resilience Act
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Cyber Resilience Act: CRA: vollständige Anwendung – Secure-b
 y-Design-Anforderungen\, Konformitätsbewertung und CE-Kennzeichnung für 
 Software und vernetzte Produkte — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Cyber Resilience Act: CRA: vollständige Anwendung – Secure-b
 y-Design-Anforderungen\, Konformitätsbewertung und CE-Kennzeichnung für 
 Software und vernetzte Produkte — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eu-forced-labour-regulation-applies@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271214
DTEND;VALUE=DATE:20271215
SUMMARY:Forced Labour Regulation: Zwangsarbeitsverordnung: Verbot des Inver
 kehrbringens\, Verkaufs oder Exports von Produkten aus Zwangsarbeit
DESCRIPTION:Die Verordnung (EU) 2024/3015 verbietet es\, Produkte\, die unt
 er Einsatz von Zwangsarbeit hergestellt wurden\, auf dem EU-Markt in Verke
 hr zu bringen\, bereitzustellen oder zu exportieren – an jeder Stelle de
 r Lieferkette. Nationale Behörden und die Kommission können verdächtige
  Produkte untersuchen und deren Rückruf\, Spende\, Recycling oder Vernich
 tung anordnen. Es gibt keine Ausnahme nach Unternehmensgröße – ledigli
 ch zusätzliche Leitlinien und eine eigene KMU-Kontaktstelle.\n\nWer betro
 ffen ist: Jedes Unternehmen\, das Produkte auf dem EU-Markt in Verkehr bri
 ngt oder von dort exportiert – Hersteller\, Importeure und Händler jede
 r Größe – mit dem höchsten praktischen Risiko für Importeure\, die a
 us Regionen oder Sektoren mit dokumentiertem Zwangsarbeitsrisiko beziehen.
 \n\nWas zu tun ist: Kartieren Sie Ihre Lieferkette hinsichtlich Zwangsarbe
 itsrisiken\, insbesondere bei Rohstoffen und Lieferanten der ersten Stufe 
 in Hochrisikoregionen oder -sektoren. Richten Sie einen Sorgfaltspflicht- 
 und Beschwerdeprozess ein\, damit Sie auf Auskunftsersuchen der Kommission
  oder des Zolls reagieren können. Bewahren Sie Lieferantenaudits\, Zertif
 izierungen und Verträge auf und verfolgen Sie die Risikoindikatoren-Daten
 bank sowie die KMU-Leitlinien der Kommission.\n\nSanktion: Rückruf sowie 
 Vernichtung\, Recycling oder Spende nicht konformer Produkte\, dazu Verwei
 gerung des Marktzugangs\; eine EU-weite umsatzbezogene Geldbuße ist nicht
  vorgesehen\, doch die Mitgliedstaaten müssen wirksame\, verhältnismäß
 ige und abschreckende Sanktionen festlegen.\n\n\nStatus: Bestätigt\nhttps
 ://eudeadlines.eu/de/deadline/eu-forced-labour-regulation-applies
URL:https://eudeadlines.eu/de/deadline/eu-forced-labour-regulation-applies
CATEGORIES:EU,Forced Labour Regulation
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Forced Labour Regulation: Zwangsarbeitsverordnung: Verbot des I
 nverkehrbringens\, Verkaufs oder Exports von Produkten aus Zwangsarbeit 
 — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Forced Labour Regulation: Zwangsarbeitsverordnung: Verbot des I
 nverkehrbringens\, Verkaufs oder Exports von Produkten aus Zwangsarbeit 
 — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:eudi-wallet-private-acceptance@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271224
DTEND;VALUE=DATE:20271225
SUMMARY:eIDAS 2: EU Digital Identity Wallet: regulierte private Dienstleist
 er müssen die Wallet zur starken Kundenidentifizierung akzeptieren
DESCRIPTION:Private Unternehmen\, die gesetzlich verpflichtet sind\, Kunden
  mit starker Authentifizierung zu identifizieren – Banken\, Zahlungs- un
 d Kryptounternehmen\, Telekommunikationsanbieter\, Energie- und Versorgung
 sunternehmen\, Versicherer\, Gesundheitsdienstleister\, Verkehrsunternehme
 n und sehr große Online-Plattformen – müssen die EU Digital Identity W
 allet akzeptieren\, wenn ein Nutzer sie anbietet\, zusätzlich zu ihren be
 stehenden Methoden.\n\nWer betroffen ist: Regulierte Dienstleister in den 
 Bereichen Finanzen\, Telekommunikation\, Energie\, Gesundheit\, Verkehr un
 d große Plattformen\, jeder Größe.\n\nWas zu tun ist: Ergänzen Sie Ihr
 e Onboarding- und Verfahren zur starken Authentifizierung um eine wallet-b
 asierte Anmeldung und KYC-Prüfung nach den EU-Referenzstandards und regis
 trieren Sie sich als vertrauende Partei (Relying Party) im Register Ihres 
 Mitgliedstaats. Testen Sie im Laufe von 2027 mit den Pilotprojekten Ihrer 
 nationalen Wallet.\n\nSanktion: Aufsichtsmaßnahmen im Rahmen der national
 en eIDAS-Durchsetzung\n\nHinweis zum Datum: 36 Monate nach den Durchführu
 ngsverordnungen (Art. 5f Verordnung 2024/1183)\; die genauen nationalen Du
 rchsetzungstermine können variieren\n\nStatus: Bestätigt\nhttps://eudead
 lines.eu/de/deadline/eudi-wallet-private-acceptance
URL:https://eudeadlines.eu/de/deadline/eudi-wallet-private-acceptance
CATEGORIES:EU,eIDAS 2
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:eIDAS 2: EU Digital Identity Wallet: regulierte private Dienstl
 eister müssen die Wallet zur starken Kundenidentifizierung akzeptieren 
 — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:eIDAS 2: EU Digital Identity Wallet: regulierte private Dienstl
 eister müssen die Wallet zur starken Kundenidentifizierung akzeptieren 
 — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:espr-first-delegated-acts-dpp@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:[indicative date] Ecodesign (ESPR): ESPR: erste produktspezifische 
 Ökodesign- und Digitaler-Produktpass-Regeln (Eisen & Stahl\, Textilien\, 
 Reifen\, Aluminium)
DESCRIPTION:Die Ökodesign-Verordnung für nachhaltige Produkte (EU) 2024/1
 781 ermöglicht es der Kommission\, Anforderungen an Haltbarkeit\, Reparie
 rbarkeit\, Rezyklatanteil und Informationen produktgruppenweise festzulege
 n\, jeweils mit einem digitalen Produktpass. Die ersten Rechtsakte (Stahl\
 , dann Textilien\, Reifen\, Aluminium\, Möbel) werden 2026-2028 erwartet 
 und gelten nach einer Übergangsfrist. Seit dem 19. Juli 2026 dürfen gro
 ße Unternehmen zudem unverkaufte Kleidung und Schuhe nicht mehr vernichte
 n.\n\nWer betroffen ist: Hersteller\, Importeure und Marken der ersten Pro
 duktgruppen\, insbesondere Kleidung\, Schuhe\, Stahlerzeugnisse\, Reifen u
 nd Möbel\; Einzelhändler müssen die Informationen des Produktpasses anz
 eigen.\n\nWas zu tun ist: Verfolgen Sie den ESPR-Arbeitsplan für Ihre Pro
 duktgruppe. Beginnen Sie\, Produktdaten (Materialien\, Herkunft\, Rezyklat
 anteil\, Reparaturinformationen) strukturiert zu erfassen\, damit sie in e
 inen digitalen Produktpass einfließen können. Führen Sie eine Richtlini
 e und Nachverfolgung für unverkaufte Waren ein – große Unternehmen mü
 ssen aussortierte unverkaufte Produkte bereits offenlegen.\n\n\nHinweis zu
 m Datum: Indikativ. Laut ESPR-Arbeitsplan 2025-2030 der Kommission sind de
 legierte Rechtsakte für Eisen & Stahl 2026 und für Textilien\, Reifen un
 d Aluminium 2027 vorgesehen\; die Pflichten gelten in der Regel etwa 18 Mo
 nate nach Erlass. Stand August 2026 wurde noch kein delegierter Rechtsakt 
 erlassen\n\nStatus: Vorgeschlagen\nhttps://eudeadlines.eu/de/deadline/espr
 -first-delegated-acts-dpp
URL:https://eudeadlines.eu/de/deadline/espr-first-delegated-acts-dpp
CATEGORIES:EU,Ecodesign (ESPR)
LAST-MODIFIED:20260907T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Ecodesign (ESPR): ESPR: erste produktspezifische Ökodesign- un
 d Digitaler-Produktpass-Regeln (Eisen & Stahl\, Textilien\, Reifen\, Alumi
 nium) — due in 7 days
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Ecodesign (ESPR): ESPR: erste produktspezifische Ökodesign- un
 d Digitaler-Produktpass-Regeln (Eisen & Stahl\, Textilien\, Reifen\, Alumi
 nium) — due in 1 day
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
BEGIN:VEVENT
UID:late-payment-regulation-proposal@eudeadlines.eu
DTSTAMP:20260909T011818Z
DTSTART;VALUE=DATE:20271231
DTEND;VALUE=DATE:20280101
SUMMARY:[indicative date] Late Payment Regulation: Vorgeschlagene EU-Zahlun
 gsverzugsverordnung: maximale Zahlungsfrist von 30 Tagen im B2B-Geschäft
DESCRIPTION:Die Kommission hat vorgeschlagen\, die Zahlungsverzugsrichtlini
 e durch eine Verordnung zu ersetzen\, die Zahlungsfristen im B2B- und B2G-
 Geschäft auf 30 Tage begrenzt\, Verzugszinsen automatisch anfallen lässt
  und nationale Durchsetzungsbehörden schafft. Das Dossier ist im Rat seit
  2024 nicht vorangekommen\, ein Datum steht daher nicht fest.\n\nWer betro
 ffen ist: Alle Unternehmen\, insbesondere KMU\, die größere Kunden mit l
 angen Zahlungszielen beliefern.\n\nWas zu tun ist: Noch kein Handlungsbeda
 rf. Beobachten Sie das Dossier\; bei Verabschiedung müssten Verträge mit
  Zahlungsfristen über 30 Tagen neu verhandelt und Rechnungs-/Mahnsysteme 
 angepasst werden\, um gesetzliche Zinsen automatisch zu berechnen.\n\n\nHi
 nweis zum Datum: Platzhalter – es existiert kein Anwendungsdatum. Der Ko
 mmissionsvorschlag COM(2023) 533 ist weiterhin offen: Das Parlament nahm s
 eine Position im April 2024 an\, doch der Zeitplan des Europäischen Parla
 ments ('Legislative Train Schedule') stuft die Akte als 'blockiert' ein (s
 eit über 9 Monaten kein Fortschritt im Rat\, Stand August 2026)\, und der
  EUR-Lex-Verfahrenstracker führt sie als 'laufend' – nicht zurückgezog
 en\, auch wenn dies einige Sekundärquellen behaupten. Die bestehende Rich
 tlinie 2011/7/EU (60-Tage-Standard) gilt weiterhin.\n\nStatus: Vorgeschlag
 en\nhttps://eudeadlines.eu/de/deadline/late-payment-regulation-proposal
URL:https://eudeadlines.eu/de/deadline/late-payment-regulation-proposal
CATEGORIES:EU,Late Payment Regulation
LAST-MODIFIED:20260908T000000Z
TRANSP:TRANSPARENT
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Late Payment Regulation: Vorgeschlagene EU-Zahlungsverzugsveror
 dnung: maximale Zahlungsfrist von 30 Tagen im B2B-Geschäft — due in 7 d
 ays
TRIGGER;VALUE=DURATION:-P6DT15H
END:VALARM
BEGIN:VALARM
ACTION:DISPLAY
DESCRIPTION:Late Payment Regulation: Vorgeschlagene EU-Zahlungsverzugsveror
 dnung: maximale Zahlungsfrist von 30 Tagen im B2B-Geschäft — due in 1 d
 ay
TRIGGER;VALUE=DURATION:-PT15H
END:VALARM
END:VEVENT
END:VCALENDAR
